1 PM-01
CITY OF
FEDERAL WAY
INSTALL YELLOW PAINTED TYPE "C" BLOCK CURB
[SOUTH OF NEW ISLAND].Incorporated as requested. See construction note #10.
2 PM-01
CITY OF
FEDERAL WAY
INSTALL YELLOW PAINTED TYPE "C" BLOCK CURB
[NORTH OF NEW ISLAND].Incorporated as requested. See construction note #10.
3 PM-01
CITY OF
FEDERAL WAY Replace Drawing 3-51 with WSDOT TS-4 steel post Incorporated as requested. All new sign notes reference WSDOT std plan
G-24.50.
4 PM-01
CITY OF
FEDERAL WAY INSTALL BIKE YIELD TO PED SIGN Incorporated as requested. See sign note S8.
5 PM-02
CITY OF
FEDERAL WAY
Dwg. No. 3-51 no longer valid. City has changed from wood to steel
post. Use WSDOT TS-4 steel post std plans G-24.50.02
Incorporated as requested. All new sign notes reference WSDOT std plan
G-24.50.
6 PM-02
CITY OF
FEDERAL WAY
INSTALL BIKE YIELD TO PED SIGN NB AND SB ENTERIING THE
ROUNDABOUT Incorporated as requested. See sign note S9.
7 PM-03
CITY OF
FEDERAL WAY
Signed have been installed per condition and email from ESM.
Update sheet to reflect field including new steel post
Incorporated as requested. Sheet PM-03 reflects the four newly installed
weight signs on steel post.
8 IL-01
CITY OF
FEDERAL WAY
Specified luminaire model may changed or no longer available.Verify
with vendor.
New part number should be ARCH-M-PA2-80-740-U-T2R-AP-10K-PR7
with 83W LED
Incorporated as requested. See revised photometric calculations.
9 IL-01
CITY OF
FEDERAL WAY Add conductor shall be alluminum and CIMCON control node
#iSLC-3100-7P-U-A-G-IO-CATB-05-T shall be installed on all luminaires
Incorporated as requested.
10 IL-01
CITY OF
FEDERAL WAY Specify new conductor shall be alluminum Incorporated as requested.
11 IL-01
CITY OF
FEDERAL WAY
New conduit should be 2" min.
The 1.5" NEW conduit shown in the wire schedule is for new conduit
segments that are intercepting existing conduit runs and extending to
new junction box locations, therefore the conduit is matching the
existing conduit size.
12 IL-01
CITY OF
FEDERAL WAY
Add CIMCON control node #iSLC-3100-7P-U-A-G-IO-CATB-05-T on
luminaire. Remove existing foundation and compact void with all
luminaires relocation.
Incorporated as requested.
13 IL-01
CITY OF
FEDERAL WAY Must be reviewed and approved by WSDOT
These pole relocations were reviewed and approved by WSDOT during
the interchange improvement permitting process.
14 IL-01
CITY OF
FEDERAL WAY WSDOT approval #1 and #2
These pole relocations were reviewed and approved by WSDOT during
the interchange improvement permitting process.
15 IL-01
CITY OF
FEDERAL WAY
This should be in the 6' planter strip. Verify.
Light pole #11 cannot be within the planter as it conflicts with existing
utilites. If placed in the planter strip avoiding utilities, the pole would be
2.5-FT from face of curb and therefore wouldn't be able to achieve the
minimum 6' clearance from the face of curb. A 16-FT arm would be
necessary to achieve a 2-FT lamp overhang but this is not available.
Therefore, the maximum available luminaire arm length of 10-FT was
proposed.
16 IL-01
CITY OF
FEDERAL WAY
Specified luminaire model may changed or no longer available.Verify
with A. New part number should be ARCH-M-PA2-80-740-U-T2R-AP-
10K-PR7 with 83W LED
Incorporated as requested. See revised photometric calculations.
Page 1 of 2 5/13/2022
IRG Woodbridge Building A Comment Responses
Comment
Number
Sheet
Number
Jurisdiction/
Department Comment Designer Response
17 IL-01
CITY OF
FEDERAL WAY
Install in planter strip if it's 6' per Dwg. No. 3-39A Light pole #11 cannot be within the planter as it conflicts with existing
utilites. If placed in the planter strip avoiding utilities, the pole would be
2.5-FT from face of curb and therefore wouldn't be able to achieve the
minimum 6' clearance from the face of curb. A 16-FT arm would be
necessary to achieve a 2-FT lamp overhang but this is not available.
Therefore, the maximum available luminaire arm length of 10-FT was
proposed.
Page 2 of 2 5/13/2022