21-103295-UPIII-Environmental Checklist-04-20-2022-V2Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 1 of 26 k:\Handouts\Environmental Checklist
SEPA ENVIRONMENTAL CHECKLIST
Purpose of Checklist
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for Applicants
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult with
an agency specialist or private consultant for some questions. You may use “not applicable” or "does not
apply" only when you can explain why it does not apply and not when the answer is unknown. You may also
attach or incorporate by reference additional studies reports. Complete and accurate answers to these
questions often avoid delays with the SEPA process as well as later in the decision-making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies
Please adjust the format of this template as needed. Additional information may be necessary to evaluate the
existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The
checklist is considered the first but not necessarily the only source of information needed to make an
adequate threshold determination. Once a threshold determination is made, the lead agency is responsible
for the completeness and accuracy of the checklist and other supporting documents.
Use of Checklist for Nonproject Proposals
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please
completely answer all questions that apply and note that the words “project,” “applicant,” and “property or
site” should be read as “proposal,” “proponent,” and “affected geographic area,” respectively. The lead
agency may exclude (for non-projects) questions in Part B - Environmental Elements –that do not contribute
meaningfully to the analysis of the proposal.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 2 of 26 k:\Handouts\Environmental Checklist
A. BACKGROUND
1. Name of proposed project, if applicable:
WinCo Foods Store No. 43 Expansion.
2. Name of applicant:
Petersen-Staggs Architects, LLP
Nate Coombs, NCARB
3. Address and phone number of applicant and contact person:
5200 W State Street
Boise, ID 83703
208.345.1462 x 109
4. Date checklist prepared:
April 15, 2022
5. Agency requesting checklist:
City of Federal Way.
6. Proposed timing or schedule (including phasing, if applicable):
Begin work in Fall 2022 with completion in 2024.
7. Do you have any plans for future additions, expansion, or further activity related to or connected
with this proposal? If yes, explain.
This proposal covers two related applications associated with the same project site (File #21-103294
and File #21-103295). Outside of what is proposed in these two applications, there are no known future
plans for additions, expansion, or further activities related to this proposal.
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal.
A site-specific geotechnical report will be prepared for the proposed project.
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
There are no known pending applications for governmental approvals of other proposals directly
affecting the subject property.
10. List any government approvals or permits that will be needed for your proposal, if known.
City of Federal Way SEPA Determination; Type III and Type V Land Use Approvals; Demolition Permit;
Building Permit; and Lakehaven Sewer Service Connection Permit.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 3 of 26 k:\Handouts\Environmental Checklist
11. Give brief, complete description of your proposal, including the proposed uses and the size of the
project and site. There are several questions later in this checklist that ask you to describe certain
aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may
modify this form to include additional specific information on project description.)
This proposal covers two related applications associated with the same project site: a Concomitant
Zoning Agreement amendment (File #21-103294, requiring a Use Process V approval) and a
Building Permit Application (File #21-103295, requiring a Use Process III approval).1
File #21-103294 (UPV) - CZA Amendment: This application proposes an amendment to the
existing Concomitant Zoning Agreement between the City of Federal Way and WinCo Foods.
This amendment would add to Section 2B exceptions, item iv, to permit the Owner to construct
a building addition to the existing grocery store building not to exceed 16,000 sq ft; with a total
building area, to include the existing covered front canopy area, not to exceed 86,000 sq ft.
Currently the existing WinCo Foods building utilizes the total grocery store (45,000 sq ft) and
drug store (22,000 sq ft) maximum gross leasable square footage as outlined in the CZA,
Section 2B. To allow for the proposed WinCo Foods addition (described under “Building
Permit,” below), an amendment to the CZA is required. An amendment to the CZA, per Section
3, is allowed by the City or the Owner by filing an application, which “shall be considered and
heard in the same manner as a City-initiated quasi-judicial rezone of the property.”
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: This application
proposes the demolition of an existing auxiliary end cap restaurant building connected to the
west wall of the existing WinCo Foods store to accommodate an addition to the WinCo Foods
store. The existing WinCo Foods building is 66,108 sq ft, and the end cap building proposed for
demolition is 8,760 sq ft. The proposed addition would add 15,483 sq ft to the existing WinCo
Foods building, for a total footprint of 81,591 square feet. This final proposed square footage is
6,723 sq ft greater than that of the existing building footprint on site (WinCo Foods store plus
auxiliary end cap building). The project would also include painting the exterior of the building,
interior remodeling, associated site/utility improvements to accommodate the building
addition, updated accessible parking/routing per current accessibility standards, and street
frontage improvements as shown in the site plans. The total property area associated with this
project is 8.43 acres.
12. Location of the proposal. Give sufficient information for a person to understand the precise location
of your proposed project, including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications related to this checklist.
Proposed project is located at 160 SW Campus Drive, Federal Way, WA.
King County TPNs: 415920-0710 & 415920-0725.
Section 19, Township 21N, Range 04E, King County, WA.
1 Unless otherwise indicated, responses provided in this checklist pertain to both of these proposal-related applications. However, some
questions may necessitate a distinct response for each application; in this case, two separate bulleted responses will be provided, as in
question 11 above.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 4 of 26 k:\Handouts\Environmental Checklist
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site:
(circle one): Flat, rolling, hilly, steep slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)?
While the vast majority of the site is flat (no more than 3% grade across site), the landscaped
area at the eastern edge of the site (along 1st Avenue) is the exception with a slope of
approximately 40%.
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils, specify them and note any agricultural land of
long-term commercial significance and whether the proposal results in removing any of these soils.
According to the USDA Web Soil Survey map, the site contains Everett-Alderwood gravelly
sandy loams, 6-15% slopes. This soil type is not classified as prime farmland.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
No; per the King County iMap system, there are no indications of landslides or unstable soils in
the immediate vicinity.
e. Describe the purpose, type, total area, and approximate quantities and total affected area of any
filling, excavation, and grading proposed. Indicate source of fill.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; it will not
involve site alterations of any kind. Any future development on this site will be required to
obtain all applicable permits and be subject to development regulations in effect at the time
of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The proposed
improvements to 1st Avenue will require approximately 550 cubic yards of fill for widening
of the roadway. Fill will be sourced from an approved local borrow pit.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
File #21-103294 (UPV) - CZA Amendment: No; the proposed CZA amendment is a non-
project action and will not involve any clearing or construction; further, it does not include
any recommendations that would impact the current protections for impacts from erosion.
Any future development on this site will be required to obtain all applicable permits and be
subject to development regulations in effect at the time of permit application; permit plans
will identify site grades and type or quantity of fill.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Erosion is
always possible during clearing, grading, and construction. BMPs will be used to limit
erosion. After construction, the site will be stabilized with vegetation; no erosion is expected
due to use of the completed project improvements.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 5 of 26 k:\Handouts\Environmental Checklist
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
File #21-103294 (UPV) - CZA Amendment: As a non-project action, the CZA amendment
does not propose any new construction or development. Future development will be
required to comply with applicable regulations at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision:
Approximately 85% of the site will be covered with impervious surfaces after construction is
complete.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no mitigation measures are proposed at this time. Any future development on this site will
be required to be in compliance with critical areas regulations pursuant to FWRC 19.145 and
obtain all applicable permits in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: During
construction, BMPs such as silt fencing, inlet protection, and covering exposed soils will be
utilized to reduce erosion. BMPs will be updated as necessary to limit erosion impacts. Upon
completion of construction, the site will be stabilized with vegetation including grass and
landscaping.
2. Air
a. What types of emissions to the air would result from the proposal during construction, operation,
and maintenance when the project is completed? If any, generally describe and give approximate
quantities if known.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; further, it
does not include any recommendations that would impact existing emissions regulations.
Any future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: During
construction, emissions from heavy equipment will be present but are expected to be minor.
At completion, emissions will be created from vehicles driven by store patrons and delivery
drivers entering and exiting the completed facility, consistent with the activity that currently
exists on the site.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
Off-site sources of emissions and/or odors are present from traffic on adjacent roadways, as
well as traffic from store patrons and delivery drivers entering/exiting the existing WinCo facility
and other adjacent businesses. These existing sources of emissions and/or odors are not
anticipated to affect the proposal.
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no mitigation measures are proposed at this time. Any future development on this site will
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 6 of 26 k:\Handouts\Environmental Checklist
be required to obtain all relevant permits and be subject to development regulations in effect
at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Construction
equipment will not be allowed to idle for extended periods of time.
3. Water
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what stream or river it flows into.
There is a mapped stream approximately 200 feet west of the westernmost WinCo parcel
boundary. The stream is unnamed and appears to flow between Panther Lake (northwest of
subject site) and the West Hylebos Wetlands Park (southeast of subject site) which contains
Maralake and Brook Lake.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-
project action and does not propose any specific construction or development activity.
The impacts of future development on surface water will be evaluated on a project-by-
project basis and, if future development is proposed in the vicinity of any streams,
lakes, or wetlands, compliance with FWRC 19.145 Environmentally Critical Areas will be
required.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project will not require work over or in the described waters; however,
frontage improvements are proposed along SW Campus Drive which will occur adjacent
to the unnamed stream.
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected. Indicate
the source of fill material.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-
project action and does not propose any specific construction or development activity.
Any future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No fill or
dredge material will be placed in or removed from surface water or wetlands.
4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
File #21-103294 (UPV) - CZA Amendment: The CZA amendment is a non-project action;
as such, it does not propose any surface water withdrawals or diversions. Any future
development on this site will be required to obtain all relevant permits and be subject to
development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No
surface water withdrawals or diversions are proposed by the project.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 7 of 26 k:\Handouts\Environmental Checklist
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
According to FEMA FIRM Panel 53033C1250G, the proposal site is located within Zone X, an
area of minimal flood hazard, and is not within a 100-year floodplain.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
File #21-103294 (UPV) - CZA Amendment: The CZA amendment is a non-project action;
as such, it does not propose any discharges of waste materials to surface waters. Any
future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No
discharges of waste materials to surface waters is proposed. The project site is
currently connected to sanitary sewer provided by the Lakehaven Water & Sewer
District.
b. Ground Water:
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities withdrawn
from the well. Will water be discharged to groundwater? Give general description, purpose,
and approximate quantities if known.
File #21-103294 (UPV) - CZA Amendment: The CZA amendment is a non-project action;
as such, it does not propose any withdrawal of or discharges to groundwater. Any
future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No
groundwater will be withdrawn, and no discharges will be made to groundwater; the
project site is currently connected to public water from the Lakehaven Water & Sewer
District.
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: domestic sewage; industrial, containing the following
chemicals... ; agricultural; etc.). Describe the general size of the system, the number of such
systems, the number of houses to be served (if applicable), or the number of animals or
humans the system(s) are expected to serve.
File #21-103294 (UPV) - CZA Amendment: The CZA amendment is a non-project action;
as such, it does not propose any discharges into the ground. Any future development
on this site will be required to obtain all relevant permits and be subject to development
regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No waste
material will be discharged into the ground. The project site is currently connected to
sanitary sewer provided by the Lakehaven Water & Sewer District.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 8 of 26 k:\Handouts\Environmental Checklist
c. Water runoff (including stormwater):
1) Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will this water
flow into other waters? If so, describe.
File #21-103294 (UPV) - CZA Amendment: The CZA amendment is a non-project action;
as such, it will not result in additional sources of runoff. The amendment does not
propose future actions that would affect how stormwater is managed on site. Any future
development on this site will be required to obtain all relevant permits and be subject to
development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
source of stormwater runoff is from the existing building, proposed building expansion,
existing parking lot, and 1st Avenue. Stormwater runoff will be collected and released
downstream following existing flow paths. The proposed stormwater system will be
designed per the 2021 KCSWDM.
2) Could waste materials enter ground or surface waters? If so, generally describe.
File #21-103294 (UPV) - CZA Amendment: The CZA amendment is a non-project action;
as such, it will not result in conveyance of waste materials to ground or surface waters.
Any future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: It is
unlikely that waste materials could enter ground or surface waters as part of this
proposal. Waste generated by the WinCo facility primarily consists of sanitary refuse
which is stored in trash compactors and/or covered dumpsters prior to removal by a
sanitary waste removal service.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
File #21-103294 (UPV) - CZA Amendment: The CZA amendment is a non-project action;
as such, it does not propose any alteration to drainage patterns in the site vicinity. Any
future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project will not alter or otherwise affect drainage patterns in the vicinity of the
site. Existing stormwater conveyance paths will be maintained. The proposed
stormwater system will be designed per the 2021 KCSWDM.
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern
impacts, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no mitigation measures are proposed. Any future development on this site will be subject to
review under the City’s SEPA implementing ordinance (FWRC Title 14). Surface water runoff
control and water quality treatment will be required per the 2021 King County Surface Water
Design Manual (KCSWDM) and the City of Federal Way Addendum to the manual. In
addition, future development will be required to obtain all relevant permits and will be
evaluated for water impacts in accordance with all plans, policies, rules, and regulations in
effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: A stormwater
detention basin will be constructed to manage stormwater from the project site in
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 9 of 26 k:\Handouts\Environmental Checklist
accordance with City of Federal Way requirements. The proposed stormwater system will be
designed per the 2021 KCSWDM.
4. Plants
a. Check the types of vegetation found on the site:
x deciduous tree: alder, maple, aspen, other
x evergreen tree: fir, cedar, pine, other
x shrubs
x grass
pasture
crop or grain
orchards, vineyards or other permanent crops.
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
File #21-103294 (UPV) - CZA Amendment: The CZA amendment is a non-project action; as
such, it does not propose any removal or alteration of vegetation. Any future development
on this site will be required to obtain all relevant permits and be subject to development
regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision:
Approximately 12,000 sf. of vegetation will be removed as part of the 1st Avenue
improvements, including grass, trees, and shrubs. Minor landscape adjustments will be
made in the existing parking lot.
c. List threatened and endangered species known to be on or near the site.
Per the U.S. Fish & Wildlife's IPaC map system, there are no threatened or endangered plant
species known to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation
on the site, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no specific measures to preserve or enhance vegetation are proposed. Any future
development on this site will be required to obtain all relevant permits and be subject to
development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Updated
landscaping will be provided to meet or exceed minimum City of Federal Way requirements.
e. List all noxious weeds and invasive species known to be on or near the site.
Per King County's iMap, Tansy Ragwort, Spotted Knapweed, and Poison-Hemlock have been found
near the site and/or on adjacent parcels. There are no known instances of noxious weeds or
invasive species on the subject site, however, we are noting the potential based on available data.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 10 of 26 k:\Handouts\Environmental Checklist
5. Animals
a. List any birds and other animals which have been observed on or near the site or are known to be
on or near the site. Examples include:
birds: hawk, heron, eagle, songbirds, other: typical crows and raptors found in urban environments
mammals: deer, bear, elk, beaver, other: coyotes, opossum, raccoons, moles, voles, mice
fish: bass, salmon, trout, herring, shellfish, other:
b. List any threatened and endangered species known to be on or near the site.
According to the U.S. Fish & Wildlife IPaC mapping system, Gray Wolf (proposed endangered) and
Marbled Murrelet (threatened), Streaked Horned Lark (threatened), Yellow-billed Cuckoo
(threatened), and Bull Trout (threatened) are sensitive species potentially affected by activities in
this site location. There is no known presence of the species listed above on the subject site;
however, we are noting the potential.
c. Is the site part of a migration route? If so, explain.
Yes, the site is located within the Pacific Flyway migratory bird route. It is not anticipated that
the proposal will impact the route.
d. Proposed measures to preserve or enhance wildlife, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no specific measures to preserve or enhance wildlife are proposed. Any future development
on this site will be required to obtain all relevant permits and be subject to development
regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No measures
to preserve or enhance wildlife are included in this proposal.
e. List any invasive animal species known to be on or near the site.
There are no invasive animal species known to be on or near the site.
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the
completed project's energy needs? Describe whether it will be used for heating, manufacturing,
etc.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment would allow a
total building area of 86,000 square feet on the subject site, which represents an increase of
up to 6,723 square feet above the existing building area. It is possible that this potential
increase in commercial square footage on site would cause a subsequent increase in energy
needs on site. Specific energy needs that may occur as a result of this proposal will be
reviewed at the time of future development.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Electricity
will be used for heating/cooling, lighting, and other fixtures related to the grocery store.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 11 of 26 k:\Handouts\Environmental Checklist
b. Would your project affect the potential use of solar energy by adjacent properties? If so,
generally describe.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action; as such, it will not affect the potential use of solar energy by adjacent properties.
Any future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: It is unlikely
that the proposed project will affect potential use of solar energy by adjacent properties. The
building expansion proposed will be constructed at an equivalent height to the existing
WinCo store facility and is not anticipated to limit daylight exposure to adjacent properties.
c. What kinds of energy conservation features are included in the plans of this proposal? List other
proposed measures to reduce or control energy impacts, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no specific measures to reduce energy consumption are proposed. Any future development
on this site will be required to obtain all relevant permits and be subject to development
regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The proposed
project will be constructed in accordance with current Washington State Energy Code
requirements.
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so,
describe.
1) Describe any known or possible contamination at the site from present or past uses.
Per a query of the Department of Ecology's What's In My Neighborhood map, the site is located
within the ASARCO Tacoma Smelter Plume Area. There are no other known or possible known
contamination sources or issues at the site.
2) Describe existing hazardous chemicals/conditions that might affect project development and
design. This includes underground hazardous liquid and gas transmission pipelines located
within the project area and in the vicinity.
There are no known existing hazardous chemicals/conditions that could affect the proposal or
any future development and design on this site. Per a query of the National Pipeline Map
System Public Viewer, the nearest underground hazardous liquid transmission pipeline is
located approximately 1.44 miles from the site.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 12 of 26 k:\Handouts\Environmental Checklist
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during
the project's development or construction, or at any time during the operating life of the
project.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-
project action and does not propose any specific construction or development activity.
Any future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision:
Gasoline, diesel fuel, and oil may be stored and/or used during construction. At
completion, household cleaners and janitorial chemicals may be stored, used, or offered
for sale. No chemicals will be produced during development, construction, or operation
of the completed project.
4) Describe special emergency services that might be required.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-
project action and does not propose any specific construction or development activity;
therefore, it does not necessitate any special emergency services. Any future
development on this site will be reviewed on a project-by-project basis and will be
required to comply with all relevant development regulations in effect at the time of
permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No
special emergency services are anticipated.
5) Proposed measures to reduce or control environmental health hazards, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-
project action and does not propose any specific construction or development activity;
as such, it is not expected to have direct environmental health impacts. Therefore, no
specific measures are proposed at this time. Any future development on this site will be
required to obtain all relevant permits and be subject to development regulations in
effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Fuel and
oil used during construction will be stored in sealed and approved containers. At
completion, janitorial or cleaning chemicals will be stored/used in accordance with
manufacturer's recommendations and local or state safety requirements; janitorial or
cleaning chemicals offered for sale will be stored and sold in original packaging and/or
in accordance with manufacturer's recommendations.
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
Noise from traffic on adjacent roads, entering/exiting adjacent parcels and entering/exiting
the existing WinCo Foods facility exists in the area. These cited sources of noise are not
anticipated to affect the proposal or any future development on this site.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 13 of 26 k:\Handouts\Environmental Checklist
2) What types and levels of noise would be created by or associated with the project on a short-
term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what
hours noise would come from the site.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-
project action and does not propose any specific construction or development activity.
Any future development on this site will be required to obtain all relevant permits and be
subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Short-
term noise will be created by heavy equipment and general contractor's tools during
demolition and project construction. Long-term noise will be created by traffic entering
and exiting the completed project.
3) Proposed measures to reduce or control noise impacts, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-
project action and does not propose any specific construction or development activity;
therefore, no mitigation measures are proposed at this time. Any future development on
this site will be required to obtain all relevant permits and be subject to development
regulations and approved city work hours in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision:
Construction equipment will be equipped with functional muffled exhaust systems and
will not be allowed to idle for extended periods of time.
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties? Will the proposal affect current land
uses on nearby or adjacent properties? If so, describe.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no direct impacts on land use are anticipated. Additionally, the CZA only applies to this
particular site and does not govern development on any other properties. Any future
development on this site will be required to obtain all relevant permits and be subject to
development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The site is
currently used as a grocery store by the project proponent, WinCo Foods, as well as a
takeout teriyaki restaurant. Uses to the east, across 1st Way S, are an elementary school and
apartments; uses to the south are restaurants, Starbucks and IHOP; to the west is SW
Campus Drive and vacant land; and to the north is Panther Lake Park, which also houses the
Federal Way National Little League Complex. The project is not expected to affect existing
uses on adjacent parcels.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated, how
many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use?
The subject site has not been used as working farm or forest land. None of the subject parcels
are held in farm or forest land resource designations for tax purposes or otherwise.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 14 of 26 k:\Handouts\Environmental Checklist
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides, tilling,
and harvesting? If so, how:
File #21-103294 (UPV) - CZA Amendment: There is no working farm or forest land in the
vicinity of the subject site. The site is part of the urbanized metropolitan area and is
already developed, as are all its surroundings.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project is not anticipated to affect or be affected by surrounding working farm
or forest land business operations, as there is no working farm or forest land in the
vicinity. This will be an expansion of the existing site use.
c. Describe any structures on the site.
There is currently a 66,108 sq. ft. grocery store with an 8,760 sq. ft. end cap restaurant building on
the site.
d. Will any structures be demolished? If so, what?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action; as such, it does not propose demolition of any structures. Any future development
on this site will be required to obtain all relevant permits and be subject to development
regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The proposal
includes demolition of the 8,760 sq. ft. end cap restaurant.
e. What is the current zoning classification of the site?
The site is zoned BC – Community Business. The site is also subject to a Concomitant Zoning
Agreement between the City of Federal Way and WinCo Foods.
f. What is the current comprehensive plan designation of the site?
The current comprehensive plan designation is BC – Community Business.
g. If applicable, what is the current shoreline master program designation of the site?
Not applicable; the site is not within a regulated shoreline area of Federal Way.
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
Per King County's iMap, the site is in an area of medium to high susceptibility to groundwater
contamination and is located within a 5-year wellhead protection area.
i. Approximately how many people would reside or work in the completed project?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. It is possible
that the amendment’s proposed increase in allowed commercial building area may lead to
additional employees on site, but that is not known at this time. Specific impacts that may
occur as a result of this proposal will be reviewed at the time of future development.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The project
proposes an addition to an existing WinCo Foods grocery store facility, which may employ a
few additional people related to the expansion of the building’s square footage.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 15 of 26 k:\Handouts\Environmental Checklist
j. Approximately how many people would the completed project displace?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; as such, no
one would be displaced. Additionally, the site is already developed and there are no
residential units currently provided on the site. Any future development on this site will be
required to obtain all relevant permits and be subject to development regulations in effect at
the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No people
will be displaced by the project; no residential units are currently provided on the site.
k. Proposed measures to avoid or reduce displacement impacts, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no mitigation measures are proposed at this time. Any future development on this site will
be required to obtain all relevant permits and be subject to development regulations in effect
at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No
displacement impacts are anticipated; no measures are proposed.
l. Proposed measures to ensure the proposal is compatible with existing and projected land uses
and plans, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment (Type V Land Use
Review process) is a non-project action and does not propose any specific construction or
development activity; therefore, no specific measures are proposed at this time. The
proposed amendment is consistent with the City’s comprehensive plan and future land use
map, and does not change existing land uses on the subject property or adjoining
properties. Any future development on this site will be required to obtain all relevant permits
and be subject to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project will be designed to comply with current City of Federal Way development,
building, and zoning guidelines. The proposed project will undergo a Type III and Type V
Land Use Review process to ensure compatibility with local code requirements.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term
commercial significance, if any:
As the site and its surroundings are already developed, and there is no working farm or forest land
in the vicinity, no impacts to agricultural and forest lands are anticipated; no measures are
proposed.
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or
low- income housing.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no housing units will be provided.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No housing
units will be provided by the proposed project.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 16 of 26 k:\Handouts\Environmental Checklist
b. Approximately how many units, if any, would be eliminated? Indicate whether high-, middle-, or
low-income housing.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no housing units will be eliminated.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No housing
units will be eliminated by the proposed project.
c. Proposed measures to reduce or control housing impacts, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no mitigation measures are proposed at this time. Any future development on this site will
be required to obtain all relevant permits and be subject to development regulations in effect
at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No housing
impacts are anticipated; no measures are proposed.
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The tallest
height of the proposed additional structure is 29 feet, 4 inches. The tallest height of the
existing structure is 35 feet. The proposed principal exterior building material is split-face
masonry.
b. What views in the immediate vicinity would be altered or obstructed?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No views in
the immediate vicinity will be altered or obstructed.
c. Proposed measures to reduce or control aesthetic impacts, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no specific measures are proposed at this time. Any future development on this site will be
required to obtain all applicable permits and be subject to development regulations in effect
at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project will be designed to meet or exceed local design guidelines and
requirements for construction.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 17 of 26 k:\Handouts\Environmental Checklist
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
completed project is not expected to produce light beyond sentinel lighting near building
entrances, exits, pathways, and parking areas, primarily at night. Glare is not anticipated
beyond daylight reflection from glass entrance doors and exterior windows.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: It is unlikely
that light or glare will create safety hazards or cause view interference. Low glare exterior
lighting will be used to minimize impacts to safety or interference with views.
c. What existing off-site sources of light or glare may affect your proposal?
Adjacent businesses, traffic, and streetlights create off-site light and glare but are not anticipated
to affect the proposal or any future development on this site.
d. Proposed measures to reduce or control light and glare impacts, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; as such, it
will not have any specific light and glare impacts. Therefore, no specific mitigation measures
are proposed at this time. Any future development on this site will be required to obtain all
applicable permits and be subject to development regulations in effect at the time of permit
application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Low glare
lighting and positioned shielding will be utilized to control light pollution and to reduce light
and/or glare impacts to neighboring properties.
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
Recreational opportunities in the vicinity of the subject site include WinCo Park, West Hylebos
Wetlands Park, Panther Lake Park, and the Federal Way National Little League Complex.
b. Would the proposed project displace any existing recreational uses? If so, describe.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. No impacts
to or displacement of existing recreational uses are anticipated.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project is not anticipated to displace any existing recreational uses.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 18 of 26 k:\Handouts\Environmental Checklist
c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities
to be provided by the project or applicant, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; no impacts
to or displacement of existing recreational opportunities are anticipated. Therefore, no
specific mitigation measures are proposed at this time. Any future development on this site
will be required to obtain all applicable permits and be subject to development regulations in
effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The existing
WinCo facility currently contains a recreational area, WinCo Park; no additional recreation
opportunities are proposed by the project, as no impacts to existing recreational uses are
anticipated.
13. Historic and Cultural Preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old
listed in or eligible for listing in national, state, or local preservation registers ? If so, specifically
describe.
Per a query of the Department of Archaeology & Historic Preservation's Washington Information
System for Architectural and Archaeological Records Data (WISAARD) database, there are no
buildings, structures, or sites on or adjacent to the site listed in or eligible for listing in preservation
registers.
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts, or
areas of cultural importance on or near the site? Please list any professional studies conducted at
the site to identify such resources.
Per the WISAARD database, the site is within a Tribal Area of Interest to the Muckleshoot, Samish,
Puyallup, Suquamish, Tulalip, Squaxin, & Snoqualmie Indian Tribes. There are no known
landmarks, features, or other evidence of Indian or historic use or occupation of the site, however,
we are noting the potential Tribal significance. The WISAARD map indicates the project is in a
blended area of risk to contain environmental factors with archaeological resources based on the
Predictive Model map layer, ranging from low risk, moderate risk, and high risk.
c. Describe the methods used to assess the potential impacts to cultural and historic resources on or
near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
A query of the Department of Archeology & Historic Preservation's Washington Information System
for Architectural and Archaeological Records Data (WISAARD | wisaard.dahp.wa.gov/Map) map was
performed June 17, 2021.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; no direct
impacts to existing resources are anticipated. Therefore, no specific measures are proposed
at this time. Any future development on this site will be required to obtain all applicable
permits and be subject to development regulations in effect at the time of permit application.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 19 of 26 k:\Handouts\Environmental Checklist
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: If resources
are discovered during construction activities, operations will stop until a qualified
archaeologist evaluates the situation and outlines a course of action.
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any.
The site is accessed from two shared driveways off SW Campus Drive and one access road off 1st
Avenue South. No new access roads or driveways are proposed.
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?
Yes, the site is currently served by King County Metro (DART Route 903), with a bus stop located
on the site at Campus Drive and 1st Avenue S.
c. How many additional parking spaces would the completed project or non-project proposal have?
How many would the project or proposal eliminate?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; it would not
provide or eliminate any parking spaces. Specific changes to on-site parking that may occur
as a result of this proposal will be reviewed at the time of future development.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project will add 3 parking spaces and remove 1 parking space for a net increase of
2 spaces.
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle
or state transportation facilities, not including driveways? If so, generally describe (indicate
whether public or private).
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application; specific transportation-
related improvements that may be needed will be reviewed and conditioned at that time.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project will add a bike lane, widen the existing planter strip, and provide a wider
pedestrian sidewalk along 1st Avenue. These improvements will occur primarily within the
existing right-of-way, and additional right-of-way will be dedicated by WinCo to the City of
Federal Way. Half-street frontage improvements and right-of-way dedication on SW Campus
Drive may be required. A waiver is being submitted for review by the Public Works Director.
In addition, this project will pay the City's required transportation impact fees.
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
No, the proposal will not use or occur in the immediate vicinity of water, rail, or air transportation.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 20 of 26 k:\Handouts\Environmental Checklist
f. How many vehicular trips per day would be generated by the completed project or proposal? If
known, indicate when peak volumes would occur and what percentage of the volume would be
trucks (such as commercial and nonpassenger vehicles). What data or transportation models
were used to make these estimates?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application; project-specific trip
generation would be estimated and reviewed at that time.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project is expected to generate an additional 497 daily trips. This number was
calculated using information in the ITE Trip Generation Manual. The PM Peak Hour is
expected to experience the peak volumes, with an additional 46 trips.
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest
products on roads or streets in the area? If so, generally describe.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; further, it
does not enable any new construction or zoning changes that will impact the movement of
agricultural and forest products on roads or streets in the area.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No, the
proposal is not anticipated to interfere with, affect, or be affected by the movement or
agricultural and/or forest products on streets in the area.
h. Proposed measures to reduce or control transportation impacts, if any:
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no specific measures are proposed at this time. Any future development on this site will be
required to obtain all applicable permits, pay the appropriate transportation impact fees, and
may be required to dedicate right-of-way and/or construct frontage improvements.
Additionally, future development will be subject to development regulations in effect at the
time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Bike lanes
and a widened sidewalk will be added along 1st Avenue to reduce transportation impacts,
and additional 1st Avenue right-of-way will be dedicated to the City. Additionally, the
proposed project will pay the City’s required transportation impact fees.
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; it will not
have a direct impact on public services. Project-specific impacts that may occur as a result
of this proposal will be reviewed at the time of future development.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
completed project may require a nominal increase to public services such as police and fire
protection.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 21 of 26 k:\Handouts\Environmental Checklist
b. Proposed measures to reduce or control direct impacts on public services, if any.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity; therefore,
no specific measures are proposed at this time. Any future development on this site will be
required to obtain all applicable permits, pay the required impact fees, and be in compliance
with International Fire Code. In addition, future development will be subject to development
regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The
proposed project will be designed to comply with the City of Federal Way's Crime Prevention
Through Environmental Design (CPTED) Checklist to reduce crime and potential impacts to
public services.
16. Utilities
a. Circle utilities currently available at the site:
electricity, natural gas, water, refuse service, telephone, sanitary sewer,
septic system, other
b. Describe the utilities that are proposed for the project, the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might be needed.
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment is a non-project
action and does not propose any specific construction or development activity. Any future
development on this site will be required to obtain all applicable permits and will be subject
to development regulations in effect at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: The utilities
proposed for this project, along with their respective providers, are as follows:
Electricity: Puget Sound Energy
Natural Gas: Puget Sound Energy
Water: Lakehaven Water & Sewer District
Refuse Service: Waste Management
Northwest
Telephone: Lumen (CenturyLink)
Cable: Comcast
Sanitary Sewer: Lakehaven Water & Sewer
District
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 22 of 26 k:\Handouts\Environmental Checklist
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature:
Name of Signee: Jason Bruhn, PE
Position and Agency/Organization: SCJ Alliance
Date Submitted: 4-19-2022
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 23 of 26 k:\Handouts\Environmental Checklist
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(IT IS NOT NECESSARY to use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction with
the list of the elements of the environment. When answering these questions, be aware of the
extent the proposal, or the types of activities likely to result from the proposal, would affect
the item at a greater intensity or at a faster rate than if the proposal were not implemented.
Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air;
production, storage, or release of toxic or hazardous substances; or production of noise?
File #21-103294 (UPV) - CZA Amendment: This is a non-project action and does not propose any
specific construction or development activity. No increase in runoff-generating surfaces, pollutants,
or toxic waste production is anticipated as a result of the proposed CZA amendment, which would
apply only to the subject site. The amendment would likely result in increased commercial building
square footage on the already-developed site. Increased commercial building square footage may
have temporary or permanent emissions and noise impacts. Any future development on this site will
be required to obtain all applicable permits and will be subject to development regulations in effect
at the time of permit application.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No increase in runoff-
generating surfaces, pollutants, or toxic waste production is anticipated from the already-developed
site. Increased commercial building square footage may have temporary or permanent emissions
and noise impacts.
Proposed measures to avoid or reduce such increases are:
File #21-103294 (UPV) - CZA Amendment: This is a non-project action and does not propose any
specific construction or development activity. Any future development on this site will be required to
obtain all applicable permits and be subject to development regulations in effect at the time of permit
application for water; air emissions; production, storage, and release of toxic or hazardous
substances; or noise pursuant to FWRC 19.145 Environmentally Critical Areas, FWRC Title 15
Shoreline Management, tree retention and landscaping standards per FWRC Title 19, the 2021 King
County Surface Water Design Manual (KCSWDM) and the City of Federal Way Addendum to the
manual.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application for water; air emissions;
production, storage, and release of toxic or hazardous substances; or noise pursuant to FWRC
19.145 Environmentally Critical Areas, FWRC Title 15 Shoreline Management, tree retention and
landscaping standards per FWRC Title 19, the 2021 King County Surface Water Design Manual
(KCSWDM) and the City of Federal Way Addendum to the manual.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 24 of 26 k:\Handouts\Environmental Checklist
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment applies only to a single,
fully-developed site and does not propose any specific construction or development activity. No
impacts to any plants, animals, fish, or marine life are anticipated as a result of the proposed
amendment.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No impacts to any
plants, animals, fish, or marine life are anticipated as a result of the proposed building explanation.
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
File #21-103294 (UPV) - CZA Amendment: is a non-project action and does not propose any specific
construction or development activity. Any future development on this site will be required to obtain
all applicable permits and be subject to development regulations in effect at the time of permit
application pursuant to FWRC 19.145 Environmentally Critical Areas, FWRC Title 15 Shoreline
Management, tree retention and landscaping standards per FWRC Title 19, the 2021 King County
Surface Water Design Manual (KCSWDM) and the City of Federal Way Addendum to the manual.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application pursuant to FWRC 19.145
Environmentally Critical Areas, FWRC Title 15 Shoreline Management, tree retention and landscaping
standards per FWRC Title 19, the 2021 King County Surface Water Design Manual (KCSWDM) and the
City of Federal Way Addendum to the manual.
3. How would the proposal be likely to deplete energy or natural resources?
File #21-103294 (UPV) - CZA Amendment: is a non-project action and does not propose any specific
construction or development activity. No impacts to energy or natural resources are anticipated as a
result of the proposed amendment.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No impacts to energy
or natural resources are anticipated as a result of the proposed amendment.
Proposed measures to protect or conserve energy and natural resources are:
File #21-103294 (UPV) - CZA Amendment: is a non-project action and does not propose any specific
construction or development activity. Any future development on this site will be required to obtain
applicable permits and be subject to development regulations in effect at the time of permit
application and reviewed for potential impacts to energy and natural resources pursuant to the
Federal Way Revised Code (FWRC) and International Building Code (IBC).
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Any future
development on this site will be required to obtain applicable permits and be subject to development
regulations in effect at the time of permit application and reviewed for potential impacts to energy
and natural resources pursuant to the Federal Way Revised Code (FWRC) and International Building
Code (IBC).
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 25 of 26 k:\Handouts\Environmental Checklist
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study) for governmental protection; such as parks,
wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime farmlands?
File #21-103294 (UPV) - CZA Amendment: The proposed CZA amendment applies only to a single,
fully-developed site and does not propose any specific construction or development activity. No
impacts to environmentally sensitive areas or areas designated for governmental protection are
anticipated as a result of the proposed amendment.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No impacts to
environmentally sensitive areas or areas designated for governmental protection are anticipated as a
result of the proposed amendment.
Proposed measures to protect such resources or to avoid or reduce impacts are:
File #21-103294 (UPV) - CZA Amendment: is a non-project action and does not propose any specific
construction or development activity. Any future development on this site will be required to obtain
all applicable permits and be subject to development regulations in effect at the time of permit
application and reviewed for potential impacts pursuant to FWRC 19.145 Environmentally Critical
Areas, FWRC Title 15 Shoreline Management, and compliance with SEPA requirements, if necessary.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application and reviewed for potential impacts
pursuant to FWRC 19.145 Environmentally Critical Areas, FWRC Title 15 Shoreline Management, and
compliance with SEPA requirements, if necessary.
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
File #21-103294 (UPV) - CZA Amendment: is a non-project action and does not propose any specific
construction or development activity. The proposed CZA amendment applies only to a single, fully-
developed site and does not propose any specific construction or development activity. No direct
impacts to land and shoreline use are anticipated as a result of the proposed amendment.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: No direct impacts to
land and shoreline use are anticipated as a result of the proposed project.
Proposed measures to avoid or reduce shoreline and land use impacts are:
File #21-103294 (UPV) - CZA Amendment: is a non-project action and does not propose any specific
construction or development activity. Any future development on this site will be required to obtain
all applicable permits and be subject to development regulations in effect at the time of permit
application and will conform to SEPA requirements, if necessary.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application and will conform to SEPA
requirements, if necessary.
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.cityoffederalway.com
Bulletin #050 – October 17, 2016 Page 26 of 26 k:\Handouts\Environmental Checklist
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
File #21-103294 (UPV) - CZA Amendment: is a non-project action and does not propose any specific
construction or development activity. The proposed CZA amendment applies only to a single, fully-
developed site and does not propose any specific construction or development activity; therefore, it
will not directly impact transportation or public services and utilities. The amendment may facilitate
increased commercial building square footage on site, which could potentially result in minor
increases in demand on transportation or public services and utilities in the future.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: will not directly
impact transportation or public services and utilities. The amendment may facilitate increased
commercial building square footage on site, which could potentially result in minor increases in
demand on transportation or public services and utilities in the future.
Proposed measures to reduce or respond to such demand(s) are:
File #21-103294 (UPV) - CZA Amendment: is a non-project action and does not propose any specific
construction or development activity. Any future development on this site will be required to obtain
all applicable permits and be subject to development regulations in effect at the time of permit
application, and will also be required to pay transportation impact fees. Because the site is located
on a bus line, applications for future development on the site will be reviewed by the city’s Public
Works department and routed to the relevant transit agencies.
File #21-103295 (UPIII) - Master Land Use Application for a Land Use Decision: Any future
development on this site will be required to obtain all applicable permits and be subject to
development regulations in effect at the time of permit application, and will also be required to pay
transportation impact fees. Because the site is located on a bus line, applications for future
development on the site will be reviewed by the city’s Public Works department and routed to the
relevant transit agencies.
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws
or requirements for the protection of the environment.
This proposal has no known conflicts with local, state, or federal laws.