Loading...
05-17-2022 The DipIh St & 21St Ave S Foa;,) flity Study i 0 D 01 '- � � Cit C cil May 17, 2022 Senior Planner, Chaney Skadsen Policy Question Should the City Council authorize the use of up to $100,000 in funds currently appropriated for the Community Development Department Planning Division operating budget, as well as $200,000 in uncommitted funds from the Sound Transit Capital Fund, for a S 320th Street/21st Avenue S crossing Feasibility Study? S 3201h St & 21st Ave S Planned Signalized Intersection U Feasibility Study Scope • Data Collection • Analysis • Traffic operational analysis/traffic modeling to determine whether or not we can modify this intersection to begin with • Stormwater evaluation &recommendation • Utility relocation • Identification of potential limitations • Report & Concept Plan • Technical report • Conceptual design Financial Impact No new funds will be required to complete the study Community Development Department Planning Division - $100,000 Sound Transit Capital Fund — $200,000 Basis for Request • 2015 Comprehensive Plan • Existing Conditions • Community Input • Gateway & Connection City Center - Subarea Plan • Balanced transportation network • Safe, efficient and enjoyable pedestrian &bicycle network (CCG14, CCP18) • Potentially construct the pedestrian overpass across 320th Street, and build phase one of the City Center pedestrian mall (2015-2035 Implementing Actions) • ...emphasize linkages between transportation facilities, Celebration and Steel Lake parks, The Commons, and surrounding communities (2015-2035 Implementing Actions) Downtown Redevelopment Potential 0 Ir 500 Pool N �6 I V, - iihwift*h" All aw e' IFIV • UFA . ..... Fig, Recipe for a Vibrant Downtown Vj ak"LL-11 � • They are beloved by their citizenry �7, ICL k6Le..'e • There is broad public &private investment rOvJe.--S • They are walkable • They have the 3 Rs (Retail, Residential, Restaurants/Bars) Cff 1117 CV-dWq wn s`t`ZIe ra. - Its �ue/� tit-e, / y rc_ CC Elevating Above the Barrier 21s' Ave LEGEND TOWN SQUARE PARK ® PARK & AIDE GARAGE RETAIL: FOOD & BEVERAGE r LANDMARK © TABLETOP INTERSECTION LOVE —FLOW STREET RETAIL PLAZA RETAIL: FOOD & BEVERAGE 5 320TH DIP 1 1 L______ Connecting People and Places • Placemaking Through Infrastructure • Centered on People Next Steps • Part 1: Feasibility Study (6/22-2/23) • Can it be built &what does it look like (engineering, stormwater, etc.) • What are the impacts to the street network (modeling), • What are impacts to property owners • Part 2: Evaluate limitations and opportunities (2/23) • Part 3: Discuss options with City Council (anticipated 3/23) • Part 4: Proceed with construction (dependent upon funding) i Qu e o n s ,144 a f � m / ? c