Loading...
22-102184-Draft 2023 TIP-05-10-22Exhibit A Map ID**Location Description Previous Years 2022 2023 2024 2025 2026 2027 2028 Total 1a City Center Access Phase 1 - Environmental Update environmental documentation for modified access at S 320th St & S 324th St 3,922 500 300 4,722 1b City Center Access Phase 2 - SB Ramps Construct all SB I-5 ramps, extend S 324th Street from 23rd Ave S to I-5 20,000 10,000 35,336 35,336 100,672 2 SR 99 @ S 373rd St Install roundabout, median control 400 500 2,000 2,000 4,900 3 SW 320th St @ 47th Ave SW Install traffic signal 569 569 4 S 312th St @ 28th Ave S Add SB right-turn lane or construct roundabout 771 771 5 SW 340th St: 37th Ave SW - City Limits Widen to 5 lanes 310 400 500 2,200 3,410 6 21st Ave S @ S 320th St Install traffic signal 100 935 1,035 7 S 320th St & 1st Ave S Add EBL, WBL, WBR, NBT, SBR; widen to 5 lanes N to 316 or Alternatlive Measure 569 9,891 10,460 8 S 348th St: 9th Ave S - SR 99 Overlay 15 90 1,026 1,131 9 16th Ave S: S 344th St - S 348th St Add SB auxiliary lane 400 1,600 4,105 6,105 10 Citywide Implement Adaptive Traffic Control System Phases I & II 2,693 300 2,993 11 Citywide Install variable lane use control signs 141 841 100 1,082 12 Military Rd S @ S Star Lake Rd Add EB right-turn lane, sidewalk 200 1,000 1,200 13 SR 509 @ SW 301st St Install compact roundabout 150 700 850 14 Citywide Implement Adaptive Traffic Control System Phase III 700 100 800 15 SR 509 @ 47th Ave SW Install compact roundabout 850 850 16 SW 340th St: 31st Ave SW - 37th Ave SW Widen to 5 lanes 500 1,500 4,000 6,000 17 Citywide Annual overlays 3,000 3,000 3,000 3,000 3,000 3,000 3,000 21,000 18 SR 509 @ 4th Ave S Install compact roundabout 200 800 1,000 19 City Center Adaptive Traffic Control System - City Center Stage 2 - Detection upgrades 700 700 20 Citywide Adaptive Traffic Control System Phase IV; 1st Ave S 750 750 21 Citywide Adaptive Traffic Control System Phase V; 21st Ave SW & SW Campus Dr 1200 1,200 22 Military Rd S: S 320th St - SR 18 Overlay 50 1200 1,250 23 S 356th St: 1st Ave S - SR 99 Widen to 5 lanes, bike lanes, sidewalks 300 300 3000 3000 13400 20,000 24 Citywide Street Vegetation Management 200 200 200 200 200 200 200 1,400 25 SW 344th St @ 27th Ave SW Construct compact roundabout 50 100 560 710 26 Citywide High Friction Surface Treatments 365 3470 3,835 27 S 320th St: 1st Ave S - SR 99 Overlay 50 2950 3,000 28 S 324th St: 11th Pl S - SR 99 Overlay 50 800 850 Subtotal Roadway Capital Projects 8,350 7,481 8,061 10,210 33,740 27,650 42,536 57,532 195,560 Map ID Location Description Previous Years 2022 2023 2024 2025 2026 2027 2028 Total 29 SW King County Regional Trail Plan Plan to connect trails to adjacent cities 100 200 300 30 1st Ave S: S 292nd St - S 312th St Shoulder improvements 3,770 3,770 31 Citywide ADA Retrofits 400 400 400 400 400 400 400 2,800 32 Citywide Pedestrian Safety Install mid-block crossing treatments or other pedestrian improvements 1,231 320 160 160 320 320 320 2,831 33 Citywide Pedestrian Safety System Improvements Install mid-block crossing treatments 160 1,080 1,240 34 Citywide RRFB Upgrades Replace median-mounted RRFB's with mast arm mountings 140 690 830 35 SR 509: SW 312th St - 21st Ave SW Install sidewalk and streetlights on south side 200 1,300 1,500 36 Federal Way Transit Center Pedestrian Access Improvements 100 900 1,000 37 S 312th St: Steel Lake Park - 28th Ave S Install sidewalk and streetlights on south side 100 650 750 38 City Center Access - BPA Trail Extension Construct multi-use path between Celebration Park and Federal Way Transit Center 600 1,000 1,000 4,100 6,700 39a Pacific Hwy S Trail - 16th Ave S (S 288th St to S 308th St) Construct multi-use path 200 250 900 2086 7,008 10,444 39b Pacific Hwy S Trail - 16th Ave S (SR 509 to S 308th St) Construct multi-use path 300 1,900 2,200 40 S 314th St: PVR Wy S - 23rd Ave S Add sidewalks and street lights 175 125 125 1,600 1,300 3,325 41a S 288th St: Military Rd S - 34th Ave S Restripe to 3 lanes with bike lanes, improve pedestrian facilities 100 900 1,000 41b S 288th St: 16th Ave S - 34th Ave S Restripe to 3 lanes with bike lanes, improve pedestrian facilities 100 100 100 2,200 2,500 42 FWHS - City Center Greenway: S 308 St / 20 Ave S Greenway improvements 100 400 500 43 Citywide Local Improvement District Non-Motorized Improvement Program 300 300 300 300 300 300 1,800 Subtotal Non-Motorized Capital Projects 2,206 2,535 5,425 7,186 9,558 3,620 3,420 9,540 43,490 TOTAL CAPITAL PROJECT COSTS 10,556 10,016 13,486 17,396 43,298 31,270 45,956 67,072 239,050 CITY OF FEDERAL WAY NON-MOTORIZED CAPITAL PROJECTS Year 2022 Costs in $ thousands TRANSPORTATION IMPROVEMENT PLAN (TIP) AND ARTERIAL STREET IMPROVEMENT PLAN - 2023 TO 2028 Year 2022 Costs in $ thousandsROADWAY CAPITAL PROJECTS