22-100918Electrical
City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CHAN
Project Address: 35924 18TH AVE SW
Project Description: Electrical wiring for sump pump in crawl space
Permit #:22-100918-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 306560 0450
Owner
Applicant
Contractor
RUNG-DAO CHAN
JUNG-DAO NATHAN CHAN
OWNER
35924 18TH AVE SW
35924 18TH AVE 18TH AVE SW
OWNER
FEDERAL WAY WA 98023
FEDERAL WAY WA 98023
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Residential 1
PERMIT EXPIRES Wednesday, 1 March, 2023
Permit Issued on Tuesday, March 1, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wash1 Igt and C� of Federal Way.
Owner or agent: I_. Date:
Construction
THIS CARD IS TO REMAIN ON -SITE
CITY or- ^�--' ' � Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 100918 00 Address: 35924 18TH AVE SW
Project: DUNG-DAO NATHAN CHAN FEDERAL WAY WA 98023-7278
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
UFER Ground (4295)
2
Ditch cover (4030)
Approved
Approved
By
Date
By
Date
®
Pool Bonding (4195)
®
Temporary Power (4275)
Approved
Approved
By
Date
By
Date
F1
Slab/Concrete Floor (4255)
Approved to place concrete
By
Date
0
Service (4235)
Approved
By
Date
Feeders/Sub-panels (4045) Rough Electrical (4225) ® Ceiling Cover (4020)
Approved Approved Approved
By Date By Date �/� By Date
Final - Electrical (4055)
Approved
By Date —/V r
Rough Electrical
❑
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date