Loading...
22-100918Electrical City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: CHAN Project Address: 35924 18TH AVE SW Project Description: Electrical wiring for sump pump in crawl space Permit #:22-100918-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 306560 0450 Owner Applicant Contractor RUNG-DAO CHAN JUNG-DAO NATHAN CHAN OWNER 35924 18TH AVE SW 35924 18TH AVE 18TH AVE SW OWNER FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 1 PERMIT EXPIRES Wednesday, 1 March, 2023 Permit Issued on Tuesday, March 1, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wash1 Igt and C� of Federal Way. Owner or agent: I_. Date: Construction THIS CARD IS TO REMAIN ON -SITE CITY or- ^�--' ' � Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 100918 00 Address: 35924 18TH AVE SW Project: DUNG-DAO NATHAN CHAN FEDERAL WAY WA 98023-7278 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. UFER Ground (4295) 2 Ditch cover (4030) Approved Approved By Date By Date ® Pool Bonding (4195) ® Temporary Power (4275) Approved Approved By Date By Date F1 Slab/Concrete Floor (4255) Approved to place concrete By Date 0 Service (4235) Approved By Date Feeders/Sub-panels (4045) Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date By Date �/� By Date Final - Electrical (4055) Approved By Date —/V r Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date