22-100833Mechanical
City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SEIBERT
Project Address: 28167 23RD AVE S
Project Description: gas furnace replacement
Permit #:22-100833-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 326081 0290
Owner
Applicant
Contractor
BARRY & LINDA SEIBERT
RACHAEL AILSHIEPACIFIC HEATING &
PACIFIC AIR SYSTEMS (GENERAL)
28167 23RD AVE S
COOLING
PACIFAS093KA (9/8/23)
FEDERAL WAY WA 98003
8607 DURANGO ST SW
12811 PACIFIC HWY SW
\
LAKEWOOD WA 98499
LAKEWOOD WA 98499
Mechanical Work Valuation
Furnaces
Additional Permit Information
9417 Is this an Online or O.T.C. application? .................. Yes
Mechanical Fixtures
iik_
PERMIT EXPIRES Monday, 22 August, 2022
Permit Issued on Wednesday, February 23, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
0 N d N,�.irW
Owner or agent: Date:
'4&CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 100833 00 Address: 28167 23RD AVE S
Project: BARRY & LINDA SEIBERT FEDERAL WAY WA
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Mechanical Rough -in (4165) 0 Gas Piping (4125) 0 Final - Mechanical (4065)
Approved Approved to release test Approved
By Date By Date By Date -xg
EJ
Rough Electrical
❑
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
I By
Date
By
Date