Loading...
20-102297-SF-Site Plan Lot 6-07-27-2020-V2Perforated pipe connection between the storm stub in the street and the tightline roof downspouts. 7 39'-1" EIL E/L P/L 4" of well rotted compost must be tilled into the top 8" of soil wherever new impervious area is created (lawn, landscaping, etc) or soil amendment done per KCSWDM section 3.1.3.1 66'-8" 123.08' S690 27' 54"E L> U, protect downstream cb with silt socks G —I s °° ti HGw M 1 N1 o � quarry spall 1 N construction entrance 1 N47° 76O8 \ Temporary Erosion 1 Control Fence 1 z � 1 43 0 Site Plan - CHD-2042991-S Lot 6 Scale: 1" = 20-0" APPROVED 08/18/2020 PROPERTY Property Area = 7460 Sq.Ft. Setback Area = 2062 Sq.Ft. Buildable Area = ............................................................. HABITABLE 5398 Sq.Ft. 1st Floor = 1906 Sq.Ft. 2nd Floor = 2056 Sq.Ft, Total Habitable = 3962 Sq.Ft. IMPERMEABLE & PERMEABLE 1st Floor = 1906 Sq.Ft. Driveway = 375 Sq.Ft. Garage = 268 Sq.Ft. Overhang = 268 Sq.Ft. Porch (front) = 71 Sq.Ft. Total Impermeable = 2888 Sq.Ft. Permeable Area = 4572 Sq.Ft. Total Impermeable / Property Area (2888 / 74601= 38.71 % 1st Floor = 1906 Sq.Ft. Garage = 268 Sq.Ft. Overhang = 268 Sq.Ft. Porch (front) = 71 Sq.Ft. Total Coverage = 2513 Sq.Ft. Total Coverage / Property Area (2513 / 7460) = 33.69% RESUBMITTED Aug 11 2020 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT Legend Living Space Wh— DrivewaVSidewalk - H/W = Water Line S = Sewer / Septic G = Gas / Propane E/L = Electrical iu z O m 0" E-� C-q n3 v, tn m00 I N a) t W � O � IuW N r ZF CD M o �Q 0 LU o UN IL M O W Wco T W M 6 E O N � � � m � LL rl E 3 r - 3 E _ m E - o E £ E E c E o d$'o aE _ E E _ U Ev = d o E rn m f N E 3daEo _ n�F _ u U E E N 3 d a� E.� E� U �E `m3 m rn O o ~ 3 m U 3m,i ati 3 Site Plan CHD Job #: 20-0039 Printed On: 7/231202011:55:53 Layout Sheet# 1of1 Sheet: A0.1