21-103653-Permit FinalCity of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: KUMAR ESTATES LOT 3
Project Address: 29806 18TH PL S
Project Description: BLUEBEAM - Construction of a soil retention wall.
Building - Single Family
Permit #:21-103653-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 367440 0137
Owner
Applicant ,
Contractor
Lender_
KEN KUMARKK GENERAL
SCOTT BONIFIELD
K K GENERAL CONTRACTOR
CONTRACTOR LLC
30346 10TH AVE S
LLC
29620 18TH AVE S
FEDERAL WAY WA 98003-4104
29801 18TH AVE S
FEDERAL WAY WA 98003
FEDERAL WAY WA 98003
Census Category: 565 - Fence/retaining wall
Includes: # 1
#2
#3
#4
Occu anc Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Mechanical to be Included? ..................................... No Number of Stories...................................................
Is this an Online or O.T.C. application? .................. No Plumbing to be Included?........................................ No
Total Valuation: 4,500.00
No Fixtures Associated With This Permit 11
CONDITIONS:
All recommendations of the Geotechnical report must be followed.
Minimum 4" perforated drainage pipe shall be placed behind the wall at the base to direct drainage to an
appropriate discharge location. Soil drainage area shall extend at least 18" horizontally from the back of
the wall and to within one foot of the top of the wall.
Geotechnical engineer must be onsite to observe geotechnical aspects of the design, in particular wall
subgrade, fill placement and compaction, drainage placement and materials.
If the wall is in the backfill zone of the house, structural fill shall be used for wall support footing, per the
finical report
PERMIT EXPIRES Saturday, 23 April, 2022
Permit Issued on Monday, October 25, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wzshir7gt6i7 an �tlf Cit r, Federal Way.
I�
Owner or agent: Date
THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 103653 00 Address: 29806 18TH PL S
Project: KEN KUMAR FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
®
SWM Precon Site Mtg (4400)
Initial Erosion Control (4365)
Q
Footings/Setback (4110)
Approved
To be done PRIOR to breaking ground
Approved to place concrete
By
Date
By
Date
By
Date
®
Foundation Wall (4115)
❑5
Drainage/Downspout (4040)
11 �+ II
Slab/Concrete Floor (4255)
Approved to place concrete
Approved to backfill
Approved to place concrete
By
Date
By
Date
By
Date
]
Underfloor Framing (4285)
®
Floor Sheathing (4105)
®
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
By
Date
90
Roof Sheathing (4220)
41
Fire/Draft Stops (4095)
72
Interim Erosion Control (4370)
Approved to install roofing
Approved
Approved
By
Date
By
Date
By
Date
Prior to scheduling a Framing inspection; 13 Framing (4120) 1d Insulation (4150)
Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard
and Fire/Draft Stop inspections must be signed -
off and approved. IBC 109.3.4 By Date By Date
15
Gypsum Wallboard Nailing (4130) 1
16
Final Erosion Control (4375)
97
Final - Building (4050)
Approved to install mud & tape
Approved
Approved
By
Date
By
Date
By
Afl) Date
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date