Loading...
20-104946 InspectionTHIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 104946 00 Address: 118 S 339TH CIR Project: BINH NGUYEN FEDERAL WAY WA 98003-4538 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ Footings/Setback (4110) 0 Foundation Wall (4115) 3❑ Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date ❑ Re -steel (4215) ❑ Plumbing Groundwork (4190) ❑ Slab/Concrete Floor (4255) Approved to place concrete or grout Approved to cover Approved to place concrete By Date By Date By Date ❑ Underfloor Framing (4285) ® Floor Sheathing (4105) ❑ Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date ❑ Roof Sheathing (4220) 11 Rough Plumbing (4230) ❑ Mechanical Rough -in (4165) Approved to install roofing Approved Approved By Date By Date By Date ❑ Gas Piping (4125) 14 Fire/Draft Stops (4095) Approved to release test Approved By Date By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 15 Framing (4120) 16 Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) Approved to insulate Approved to install wallboard Approved to install mud & tape By Date By Date By Date ❑ Suspended Ceiling Grid (4265) ❑ Final - S K F & R (4060) ❑ Final - Planning Approved to drop tile Approved Approved By Date By Date By Date ❑ Final - Mechanical (4065) ❑ Final - Plumbing (4075) ❑ Final - Building (4050) Approved Approved Approved By Date By Date By Date ❑ Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date