Loading...
21-101918-Permit FinalCity of Federal way Coirununity Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ST VINCENT DE PAUL PARISH Project Address: 30525 8TH AVE S Building - Commercial Permit #:21-101918-00-CQ Inspection Request Line: (253) 835-3050 Parcel Number: 082104 9005 Project Description: BLUEBEAM - Replace 3 existing beams for an existing covered walkway. Owner Applicant Contractor Lender ST VINCENT DE PAUL PARISH JESSICA HALLTOP RUNG TOP RUNG CONSTRUCTION OWNER IS LENDER 30525 8TH AVE S CONSTRUCTION 25924 78TH AVE S FEDERAL WAY WA 98003 25924 78TH AVE S KENT WA 98032 KENT WA 98032 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction T e: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? ..................................... No Mechanical Work Valuation? .................................. 0 Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ No Zoning Designation ........................................ .. RS 7.2 Total Valuation: 38,103.00 Plumbing Work Valuation?....................................1 0 Number of Stories .................................. I Permit for Building Shell Only? .............................. No Comprehensive Plan Designation ................ SF - High -Density Residential No Fixtures Associated With This Permit !! PERMIT EXPIRES Sunday, 19 December, 2021 Permit Issued on Tuesday, June 22, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of _ Washington and the City of Federal Way. Owner or agent �' E _ Date: THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 101918 00 Address: 30525 8TH AVE S Project: ST VINCENT DE PAUL PARISH FEDERAL WAY WA 98003-4115 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Footings/Setback (4110) Foundation Wall (4115) Q Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date ® Re -steel (4215)❑ Slab/Concrete Floor (4255) ® Underfloor Framing (4285) Approved to place concrete or grout Approved to place concrete Approved to sheath floor By Date By Date By Date Q Floor Sheathing (4105) ® Shear Walls (4245) 0 Roof Sheathing (4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By Date By Date 10 Fire/Draft Stops (4095) Approved By- Date Prior to scheduling a Framing inspection; 71 Framing (4120) Electrical, Plumbing & Mechanical Rough -in Approved to insulate and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 By Date Fl-21 Insulation (4150) 1s Gypsum Wallboard Nailing (4130) t4 Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date Fl-51 Final - S K F & R (4060) 16 Final - Building (4050) Approved Approved By Date By Date /o Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date