Res 90-033
0072.150.016
JDW/naa
OS/21/90
R: 06/05/90
RESOLUTION NO.
90-33
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF FEDERAL WAY, WASHINGTON, APPROVING THE
PRELIMINARY PLAT OF GROUSEPOINTE III, KING
COUNTY BUILDING AND LAND DEVELOPMENT FILE NO.
89PO062.
WHEREAS, the Hearing Examiner for King County held a
public hearing concerning the preliminary plat of Grousepointe
III, and
WHEREAS,
at the conclusion of said hearing the King
County
Hearing
Examiner
issued
his
findings,
conclusions,
conditions, recommendations and order, and
WHEREAS, subsequent to said hearing and said decision,
the
City
of
Federal
Way
incorporated,
said
incorporation
occurring prior to the King County Council making a decision on
the preliminary plat of Grousepointe III, and
WHEREAS, the City Council for the City of Federal Way
is the body now having jurisdiction and authority to pass upon
the approval, denial or modification of the conditions of said
preliminary plat, and
WHEREAS,
the ci ty Council determined the need for a
public hearing to be held within the corporate limits of the
newly incorporated City of Federal Way,
and having called for
said hearing and notice of said hearing having been given, the
hearing having been held on May 1, 1990, and continued to May 17,
1990, and at the conclusion of said hearings the City council
having made its decision and determined that there was a need to
JDWO0828R1
-1-
COpy
modify the conditions of approval, NOW, THEREFORE,
THE
CITY
COUNCIL
OF
THE
CITY
OF
FEDERAL
WAY,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section
1.
The
findings,
conclusions
and
recommendations
of
the
King
County
Hearing
Examiner
issued
February 2, 1990, which included a recommendation to approve the
preliminary
plat
of
Grousepointe
III,
subject
to
certain
conditions, are hereby adopted as the Findings and Conclusions of
the city Council.
section 2.
The preliminary plat of Grousepointe III is
hereby
approved
subject
to
the
Findings,
Conclusions,
Recommendations
and
Conditions
of
the
King
County
Hearing
Examiner, issued February 2, 1990, and the Recommended Conditions
from the King County staff, as modified, which recommendations
were part of the King County Hearing Examiner's
record,
and
subject to the further determination by the city Council that it
is in the publ ic health,
safety and general welfare that the
Hearing Examiner's Recommendations be further modified to comply
with the conditions recommended by the Federal Way Staff and the
further determination by the city Council that it is
in the
public health, safety and general welfare that Conditions #11 and
#13 of the King County Staff Report be modified to require full
street improvements be in place on the roadway serving the plat
within a 48 foot right-of-way, within which right-of-way there
shall be a minimum of 28
feet of paving,
curbs,
gutters and
sidewalks on both sides of the street.
In addition, curb, gutter
and sidewalk will be required to be installed along 30th Avenue
JDWO0828R1
-2-
Southwest for the entire frontage of the plat upon said street,
and the paving shall be extended from the existing paving along
30th Avenue Southwest to the gutter.
RESOLVED by the City Council of the City of Federal Way
this 5th day of June, 1990.
APPROVED:
~ ~RA f!!:¿
FILED WITH THE CITY CLERK: June 4, 1990
PASSED BY THE CITY COUNCIL: June 5, 1990
RESOLUTION NO. 90-33
JDWO0828R1
-3-
-
, .
February 2, 1990
OFFICE OF THE ZONING AND SUBDIVISION EXAMINER
KING COUNTY, WASHINGTON
REPORT AND RECOMMENDATION TO THE KING COUNTY COUNCIL.
SUBJECT:
Building and Land Development File No. S89PO062
proposed Ordinance No. 90-29
proposed Plat of GROUSEPOINTE III
3 acres lying generally between 30th Avenue
Southwest and 33rd place Southwest (if both roads
were extended) and generally between Southwest
342nd Street and Southwest 34lst Street.
SUMMARY OF RECOMMENDATIONS:
Division's Preliminary:
Division's Final:
Examiner:
Approve subject to conditions
Approve subject to conditions
Approve subject to conditions
PRELIMINARY REPORT:
The Building and Land Development Division's preliminary
Report on Item No. S89PO062 was received by the Examiner
on December 27, 1989.
PUBLIC HEARING:
After reviewing the Building and Land Development
Division's Report and examining available information on
file with the application, the Examiner conducted a public
hearing on the subject as follows:
The hearing on Item No. S89PO062 was opened by the Examiner at
9:25 a.m., on January 18, 1990, in Building and Land
Development Division Hearing Room No.2, 3600 - l36th Place
S.w., Suite A, Bellevue, Washington and closed at 9:45 a.m.
participants at the public hearing and the exhibits offered and
entered are listed in the attached minutes. A verbatim
recording of the hearing is available in the office of the
zoning and Subdivision Examiner.
FINDINGS, CONCLUSIONS' RECOMMENDATION: Having reviewed the
record in this matter, the Examiner adopts and incorporates
herein by this reference the Findings, Conclusions and
Recommendation made by the Building and Land Development
Division as set forth in its preliminary Report to the zoning
and Subdivision Examiner for the January 18, 1990 public
hearing. copies of the said report will be attached to the
copies of this report submitted to the County Council.
File No. S89PO062
page 2
ORDERED this 2nd day of February, 1990.
C" .O~~
- -- -11- ---
ames N. O'Connor
Zon g and Subdivision Examiner
TRANSMITTED this 2nd day of February, 1990, by certified mail,
to the following parties of record:
Chaffey Corp./Coleen Oppelaar
Sadler/Barnard & Assoc., Inc./Tom
Triad Assoc./Gerald Buck
Ray Mangold
S. W. McConell
Rodney C. Houser
Kucharski
Bernice/Margaret Quick
AI/Maureen Opsahl
TRANSMITTED this 2nd day of February, 1990, to the following:
Tom Bertek, Building and Land Development Division
Brad Liljequist, Auilding and Land Development Division
Tammy ~ohnson, Building and Land Development Division
Steve Townsend, Building and Land Development Division
Rich Hudson, Building and Land Development Division
craig Larsen, Community Planning
K.C. Conservation Dist., Steven Fedji
Fed. Way Public Schools, Rich Hamlin
METRO, Gregory M. Bush, Mgr.
New Construction Servo
Fed. Way Water & Sewer, JohnA. Jensen
Tacoma public utilities, Alan Medak
Gail Bruce Diane Kinared
NOTICE OF RIGHT TO APPEAL
In order to appeal the recommendation of the Examiner, written
notice of appeal must be filed with the Clerk of the King
county Council with a fee of f70.00 (check payable to King
County Office of Finance) on or before February 16, 1990.
notice of appeal is filed, the original and 6 copies of a
written appeal statement specifying the basis for the appeal
and argument in support of the appeal must be filed with the
Clerk of the King County Council on or before February 23,
1990. If a written notice of appeal and filing-feë are not
filed within 14 calendar days of the date of this report, or if
a written appeal statement and argument are not filed within 21
calendar days of the date of this report, the Clerk of the
Council shall place a proposed ordinance which implements the
Examiner's recommended action on the agenda of the next
available Council meeting.
If a
Filing requires actual delivery to the Office of the Clerk of
the council, Room 403, King County courthouse, prior to the
close of business (4:30 p.m.) on the date due. Prior mailing
is not sufficient if actual receipt by the Clerk does not occur
within the applicable time period. The Examiner does not have
authority to extend the time period unless the Office of the
Clerk is not open on the specified closing date, in which event
delivery prior to the close of business on the next business
day is sufficient to meet the filing requirement.
Action of the Council Final. The action of the Council
approving or adopting a recommendation of the Examiner shall be
final and conclusive unless within thirty (30) days from the
File No. S89PO062
Page 3
Il/ltp or thp /ll'.t1011 /In IIqqrlpv",l ,.nrt-v or I"'rnnn "1'1'11.." tor /I
wril: or certiorari from thE'. SlI\,prior Collrt in nnd for the
County of King, state of Washington, for the purpose of review
of the action taken.
MINUTES OF THE JANUARY 18, 1990 PUBLIC HEARING ON BALD FILE NO.
S89PO062:
James N. O'Connor was the Hearing Examiner in this matter.
Participating in the hearing were Tom Bertek and Brad
Liljequist of Building and Land Development Division, Gerald
Buck, and Ray Mangold.
The following exhibits were offered and entered into the record:
Exhibit No.2
Exhibit No.3
Exhi bit No.4
Exhibit No.5
Building and Land Development's preliminary
report dated 1/18/90
Application dated 6/23/89
Environmental Checklist dated 6/23/90
Declaration of Non-significance dated 11/21/89
Affidavit of posting indicating 11/21/89 as
date of posting
preliminary plat dated 6/23/89
Assessor map NW 24-21-3
Letter from Metro received 1/3/90
Exhibit No.1
Exhibit No.6
Exhibit No.7
Exhibit: No.8
45l2D/JNO'C/sm
PAR~S, PLANNING AND iŒSOURCES DEPARTMENT
BUILDING AND LAFD DEVELOPMENT DIVISION
PRELIMINARY REPORT TO THE ZONING AND SUBDIVISION EXAMINER
JANuARY 18, 1990 - PUBLIC HEARING AT 9115 A.M. IN ROOM 2
PROPOSED PLAT OF GROUSEPOINTE III
(F.K.A. Wu's Park)
,FILE NO:
PROPOSED
ORDINANCE NO.:
S89PO062
90-29
\
SUMMARY OF PROPOSED ACTION:
This is a request for a subdivision of 3 acres into 12 lots
for detached single-family dwellings. The typical lot size
is 7,200 square feet. Please see Attachment 1 for a con-
ceptual map of the plat.
A.
B.
GENERAL INFORMATION:
Owner/Developer:
Engineer:
STR:
Location:
Zoning:
Acreage:
Number of Lots:
Typical Lot size:
Proposed Use:
Sewage Disposal:
Water Supply:
Fire District:
School District:
Chaffey Corporation
205 Lake st. s., suite 101
P.O. Box 560
Kirkland, WA 98083
Phone: 822-5981
sadler/Barnard & Associates, Inc.
31218 Pacific Highway S.
Federal Way, WA 98003
Phone: 941-1599
24-21-3
Generally between 30th Avenue Southwest
and 33rd Pl. S.W. (if both roads were
extended) and generally between
S.W. 342nd st. and S.W. 34lst Street.
SR
3
12
7,200 square feet
Detached single-family residences
Federal Way Water & Sewer District
city of Tacoma
*39 - Federal Way
*210 - Federal Way
HISTORY/BACKGROUND:
The Subdivision Technical Committee of King County has
conducted an on-site examination of the subject property.
It has also discussed the proposed development with the
applicant to clarify technical details of the application
and to determine the compatibility of this project with
applicable King County plans and codes and other official
documents regulating this development.
C.
THRESHOLD DETERMINATION OF ENVIRONMENTAL SIGNIFICANCE:
Pursuant to the state Environmental Policy Act (SEPA),
RCW 43.21C, the responsible official of the Building and
Land Development Division (BALD) issued a threshold determi-
nation of non-significance (DNS) for the proposed develop-
ment on November 21, 1989. This determination is based on
the review of the environmental checklist and other perti-
nent documents, resulting in the conclusion that the pro-
posal would not cause probable significant adverse impacts
on the environment. Therefore, an environmental imp3ct
statement (EIS) was not required prior to proceeding with
the review process.
D.
\
F.
4.
PROPOSED PLAT OF GROUSEPOINTE III
FILE NO. SB9PO062
Install streets, utilities, and storm drains prior
to construction of buildings.
5.
- .
Avoid dumping soil, vegetative waste, or debris
over steep slopes.
Denuded ground cover should be protected within
15 days of final di~turbance of a particular area.
6.
7.
Seeding, mulching, netting and mechanical forms of
protection can be used to stabilize exposed soils.
All stockpiles of excavated soil or fill material
should have erosion protection at all times.
8.
9.
Connect all roof drains to existing or future
storm system.
10.
Design and management of sub-surface drainage
system should be planner prior to construction and
imple~ented according to that plan. All water
should be conveyed to a safe, non-erosive outlet.
11.
All road designs should use availa~le soils
information."
14.
METRO:
No response.
NATURAL ENVIRONMENT:
1.
Topography: The site slopes downwards from the east to
the west. The grade is approximately 10-12\ in the
eastern area of the site, reducing to 2-5\ in the west-
ern half.
soils:' One type of surface soil is found on this site
per King County Soil Survey, 1973.
2.
a.
The entire site is classified AgC.
3.
AgÇ - Alderwood gravely, sandy loam, 6-15\ slopes.
Runoff is slow to medium and the hazard of erosion
is moderate. This soil has a moderate limitation
for foundations, due to a seasonally high water
table and slope. It has a severe limitation for
septic tank filter fields due to very slow permea-
bility in the substratum.
Hydrography: No mapped hydrographic features exist on
this site. The site lies within the lower Puget Sound
sub-basin of the Puget Sound drainage basin.
4.
Vegetation: This site is primarily covered with
pasture grasses. Very scattered evergreen trees and
brush occur in limited numbers.
5.
wildlife: Small birds and animals undoubtedly inhabit
this site: however, their population and species are
limited due to nearby development and the lack of
substantial vegetation on-site. No special or en-
dangered species are known to exist on or near the
property.
Mapped Sensitive Areas: The Sensitive Areas Map Folio
does not identify any Class III (severe) hazard areas
or map~ed wetlands as being present on this site.
6.
3
\
PROPOSED PLAT OF GROUSEPOINTE III
FILE NO. SB9PO062
Agencies, affected tribes and the public were offered the
opportunity to comment on or appeal the determination for
fifteen days. After the close of the comment/app~ai period,
any comments asking for a reconsideration of the threshöld
determination were reviewed and considered.
The determination was not appealed.
E.
AGENCIES CONTACTED:
1.
King county Natural Resources' Parks Division:
2.
The comments from this division have been incorporated
into this report.
King county planning' community Development Division:
3.
"The proposed plat is consistent with the Federal Way
community plan which designates the property single-
Family, four to nine dwelling units per acre. The Area
Zoning is SR."
King county Fire protection Engineer:
Fire Marshal approval has been granted as requested.
4.
seattle-King County Health Department:
The comments from the Health Department have been
incorporated into this ,report.
5.
Federal Way School District '210:
See Attachment 2.
6.
Federal Way Sewer District:
Federal Way Water District:
See Attachment 3.
7.
The comments from the water district have been
incorporated into this report.
B.
Washington state Department of Ecology:
No response.
9.
Washington state Department of Fisheries:
No response.
10.
Washington state Department of Natural Qesources:
No response.
11.
Washington state Department of Wildlife:
No response.
12.
Washington state Department of Transportation:
See Attachment 4.
13.
King County conservation District:
"The King County conservation District recommends the
following development actions:
1.
Minimize vegetative removal and disturbance.
2.
Install Temporary Erosion sedimentation control
facilities per plan prior to commencing mass
clearing and grading operations.
Where possible, avoid soil disturbance during
rainy season.
3.
2
\
P"JPOSEJ PLAO¡' OF Cr:., .,c,:F();~::;r': T'.l
FILE NO. SB9Fú~u2
G.
~EIGHBORHOOD CHARACTERISTICS:
The property lies in the Federal Way area, approximately
1/4 mile northeast of the city of Tacoma. The immediate
vicinity of the proposal is fairly urbanized, with a few
large adjacent parcels in the process of development.
Immediately north of the site is the subdivision of Terhune
Addition, with lots sizes in the 7,200-square-foot range.
East of the site is the subdivision of Alde£dale Division 2,
which also has lot sizes of approximately 7,200 square feet.
Southeast of the site across 30th Ave. S.E. is the plat of
Grousepointe, currently under construction. Bordering the
eastern one-third of the proposal to the south is the pre-
liminarily approved plat of Grousepointe II, with 19 lots.
On the rest of the south border and on the west borders are
tracts ranging from 1 to 3 acres in size.
The site itself is vacant.
H.
GENERAL DESIGN:
1.
Internal Circulation: The internal roadway section
will be constructed to urban standards. The road will
extend directly west from one location on 30th Ave.
S.W. and terminate close to the western border of the
site with a temporary cul-de-sac.
Lot Pattern: The proposed lot and street layout will
be in conformance with King county codes and policies,
with the implementation of condition 13. The King
county Road Standards require 30 feet of width for a
half-street, which the applicant is proposing for this
project.
2.
I.
TRANSPORTATION PLANS:
1.
Traffic Generation: It is expected that approximately
120 vehicle trips per day will be ge~erated with full
development of the proposed division. This calculation
includes service vehicles (i.e. mail delivery, garbage
pick-up, school bus) which may currently serve this
neighborhood, work trips, shopping, etc.
Subdivision Access: Drivers leaving the project will
gain access to the main arterial system by proceeding
north on 30th Ave. s.w., turning right on 336th Way
S.W. and turning onto 21st Avenue Southwest.
2.
3.
Adequacy of Arterial Roads: This proposal has been
reviewed under both SEPA and the criteria in King
County Ordinances 7544 and 8052, Adequacy of Existing
Roadways and Intersections. The peak-hour traffic
generated by this subdivision falls below the threshold
requiring mitigation (ten peak-hour, peak-direction
trips). The existing arterial system will accommodate
the increased traffic volume generated by this
proposal.
Transportation Plans: The subject subdivision is not
in conflict with any King County transportation plan.
4.
J.
PUBLIC SERVICES:
1.
Schools: The subject subdivision will be served by
Brigadoon Elementary, Illahee Junior High, and Decatur
Senior High Schools. See Attachment 2 of this report
for comments received from the school district.
4
\
itWPOS!:.U i'.L.oAT .
._-,j_t "....- :"1J.
rILE NO. S89POO62
2.
Parks and Open Space: The nearest community park is
the Olympic View park, located approximately 3/4 mile
north of the proposal.
Fire Protection: The certificate of Water Availability
from the Federal Way Sewer and Water District indicates
that water is available to the site in sufficient quan-
tity to satisfy King County Fire Flow Standards.
3.
K.
Prior to final recording of the plat, the water service
facilities must be either in place or bonded to meet
King County Fire Flow Standards.
UTILITIES:
1.
Sewage Disposal: The applicant proposes to serve the
subject subdivision by means of a public sewer system
managed by the Federal Way Sewer and Water District. A
certificate of Sewer Availability, dated April 6, 1989,
indicates this sewer district's capability to serve the
proposed development (see Attachment 3). The Health
Department has recommended preliminary approval of this
proposed method of sewage disposal. The Building and
Land Development Division concurs with this
recommendation.
2.
Water Supply: The applicant proposes to serve the
subject subdivision with a public water supply and dis-
tribution system managed by the Federal Way Sewer and
Water District. A certificate of Water Availability,
dated April 14, 1989, indicates this district's capa-
bility to serve the proposed development. The Health
Department has recommended preliminary approval of this
proposed method of water supply. The Building and Land
Development Division concurs with the Health Depart-
ment's recommendation.
L.
COMPREHENSIVE AND COMMUNITY PLAN:
1.
Comprehensive Plan:
This proposal is governed by the 1985 King county
Comprehensive Plan which designates this area as Urban.
The proposed subdivision is not in'conflict with the
policies of the Comprehensive Plan.
2.
community Plans:
The subject subdivision is located in the Federal Way
community Planning Area. S&e section E.2 for comments.
The subject subdivision is not in conflict with the
goals, guidelines, and policies of this plan.
M.
STATUTES/CODES: .
If approved with the recommended conditions in this report,
the proposed development will comply with the requirements
of the county and state Platting Codes and statutes, and the
lots in the proposed subdivision will comply with the mini-
mum dimensional requirements of the zone district.
N.
ANALYSIS:
The Subdivision Technical Committee has not identified any
significant issues involved in the preliminary review and
recommendations of this proposal.
5
ll.._'i~",,-.. '.-',. Ct ",.,.",'-"'\..~;.ll: ..il
FILE NO. S89PO062
O.
CONCLUSIONS:
The subject subdivision will comply with the goals and
objectives of the King County Comprehensive Plan and will
comply with the requirements of the subdivision and Zoning
Codes and other official land use controls of King County,
based on the conditions for final plat approval.
P.
RECOMMENDATIONS:
It is recommended that the subject subdivision, submitted
and received June 23, 1989, be granted preliminary approval
subject to the following conditions of final approval:
1.
compliance with all platting provisions of Title 19 of
the King County Code.
2.
All persons having an ownership interest in the subject
property shall sign on the face of the final plat a
dedication which includes the language set forth in
King County Council Motion No. 5952.
3.
shall meet the
zone classification
the approved pre-
(Minor revisions
4.
The area and dimensions of all lots
minimum requirements of the SR 7200
or shall be as shown on the face of
liminary plat, whichever is larger.
may be considered.)
The applicant must obtain final approval from the King
County Health Department.
5.
All construction and upgrading ot public and private
roads shall be done in accordance with the King County
Road Standards established and adopted by Ordinance No.
8041.
6.
If an area-wide fire protection assessment is
authorized by King County prior to final recording of
this plat, this plat shall be subject to any assessment
provided by that ordinance.
The applicant must obtain the approval of the King
County Fire Protection Engineer for the adequacy of the
fire hydra~t, water main, and fire flow standards of
Chapter 17.08 of the King County Code.
7.
8.
Final plat approval shall require full compliance with
drainage provisions set forth in King County Code 9.04
and current storm drainage requirements and guidelines
as established by Surface Water Management. Compliance
may result in reducing the number and/or location of
lots as shown on the preliminary approved plat. The
following conditions represent portions of the Code and
requirements and shall apply to All plats.
a.
BALD approval of the drainage and roadway plans is
required prior to any construction.
A separate Erosion and Sediment Control (ESC) plan
for this project shall be submitted with the
engineering plans. The plan shall show areas to
be cleared (limits of the clearing) and provide a
schedule of construction (construction sequence).
b.
c.
Retention/detention (R/D) facilities shall be
located in tracts, unless located within improved
King county rights-or-way. Maintenance aCcess
6
,..vi'c...",....; £'1...\-:;: \..of ~i.v....;l:.1...:;,;,n- .,
FILE NO. S89PO062
shall be provided to all facilities. This will
require a IS-foot access roadway to all manholes
(R/D). Access must also be provided for ~ainten-
ance of the entire pond. .. "
d.
Prior to recording of the final plat those
portions of the retention/detention facility
necessary to control the flows discharging from
the site shall be constructed and operational.
e.
oil/water separation facilities'shall be provided
at each point of permanent storm'drainage release
from the site so contaminants do not enter natural
drainage features. In addition to standard King
County oil/water separators, the applicant is
required to provide biofiltration prior to dis-
charge of stormwater into any sensitive area (e.g.
streams, wetlands, lakes, etc.). Such biofiltra-
tion includes 200 feet of broad, flat-bottom,
grass-lined swales) or equivalent systems.
Drainage outlets (stub-outs) shall be provided for
each individual lot, except for those lots
approved for infiltration by King County. Stub-
out shall be shown on the engineered plans and
shall conform to the following:
f.
1)
Each outlet shall be suitably located at the
lowest elevation on the lot, so as to service
all future roof downspouts and footing
drains, driveways, yard drains, and any other.
surface or subsurface drains necessary to
render the lots suitable for their intended
use. Each outlet shall have free-flowing,
positive drainage to an approved stormwater
conveyance system or to an approved outfall
location.
2)
Outlets on each lot shall be located with a
five-foot-high, 2" x 4" stake marked "storm"
or "drain". The stub-out shall extend above
surface level, be visible and be secured to
the stake.
3)
Pipe material shall conform to underdrain
specifications described in KCRS 7.04 and, if
non-metallic, the pipe shall contain wire or
other acceptable detection feature.
Drainage easements are required for drainage
systems designed to convey flows through more
than one lot.
4)
5)
The developer and/or contractor is
'responsible for coordinating the location of
all stub-out conveyance lines with respect to
the utilities (e.g. power, gas, telephone,
television) .
All individual stub-outs shall be privately
owned and maintained by the lot home owner.
6)
g.
In some cases, on-site infiltration systems may be
accepted for detention for the l2ta depending on
soil conditions. To determine the suitability of
the soil for infiltration systems, a soils report
that includes percolation tests and a soil log
7
h.
9.
PROPOSED PLAT OF GROUSEPOINTE III
FILE NO. S89POO62
taken at 6-foot minimum depth shall be submitted
by a professional engineer, or soil specialist.
This shall include, at a minimum, information ,on
soil texture, depth to seasonal high water ànd the
occurrence of mottling and impervious layers. The
report shall also address potential down gradient
impacts due to increased hydraulic loading on
slopes and structures. Soil permeability data
obtained from the design of the septic system may
be used for the drywell retention system, provided
data is submitted verifying that no impervious
layer exists within 6 feet of the soil surface.
If the soils report is approved, the infiltration
systems shall be installed at the time of the
building permit. A note to this effect shall be
placed on the map page of the recorded document.
The drainage plan and the recorded document shall
indicate each lot approved for infiltration.
Include with the drainage plan a downstream
analysis. This analysis must extend for a minimum
distance of 1/4 mile from the point of release of
each flow discharging from the site. The analysis
must address any existing problems with flooding,
capaci ty, overtopping" scouring, sloughing,
erosion or sedimentation of any drainage facility,
whether natural or man-made. Probable impacts due
to construction of the project must also be ad-
dressed with respect to these same concerns.
Where this analysis reveals more restrictive
conditions, more stringent drainage controls may
be required than would otherwise be necessary for
a project of this type. These controls may
include additional on-site rate and/or volume
controls, off-site improvements, or a combination
of both. Any off- site improvements will require
the approval of all affected property owners.
1.
Current standard notes and ESC notes, as
established by BALD engineering review, shall be
placed on the engineered plans.
The following notes shall be provided on the map
page of the recorded document:
j.
"All building downspouts, footing drains and
drains from all impervious surfaces such as patios
and driveways shall be connected to the approved
permanent storm drain outlet as shown on the
approved construction drawings t on
file with the Department of Public Works. This
plan shall be submitted with the application of
any building permit. All connections of the
drains must be constructed and approved prior to
the final building inspection approval." Those
lots that are designated for "Individual lot
infiltration systems, the systems shall be con-
structed at the time of the building permit and
shall comply with plans on file at the Public
Works Record Center."
The following conditions specifically address drainage
issues for this particular plat:
a.
A drainage easement may be required to discharge
the storm drainage from the retention facility to
the west to a suitable outfall. If an easement
8
'-"~l',",':>LU rLAJ. Ü:r urtvIJSE.POIN11.o III
FILE NO. S89PO062
10.
does not exist or cannot be obtained, there shall
be no point discharge of drainage onto the. abut-
ting properties. A dispersal type design may
require a larger retention tract and may cause'
reconfiguration and/or loss of lots. .
There shall be no direct vehicular access to or from
30th Ave. S.W. from those lots which a~ut it.
11.
Thirtieth Avenue Southwest shall be improved with curb,
gutter, and sidewalk where it abuts this site.
A temporary cul-de-sac shall be provided at the western
terminus of proposed Southwest 342nd Street.
12.
13.
The S.W. 342nd S~. right-or-way on-site shall be
widened from 24 feet to 30 feet.
14.
The telephone easement on-site shall be relinquished or
rerouted to the satisfaction of the Subdivision Techni-
cal Commit~ee and the holder of the easement.
OTHER CONSIDERATIONS:
1.
The subdivision shall conform to KCC 16.38 relating to
grading on private property.
Development of the subject property may require
registration with the washington State Department of
Licensing, Real Estate Division.
2.
3.
Preliminary approval of this application does not limit
the applicant's responsibility to obtain any required
permit or license from the State or other regulatory
body.
BL: 19
12/27/89
TRANSMITTED TO PAR~IES LISTED HEREAFTER:
\
Charley corporation
ATTN: Aileen Oppelaar, 205 Lake st. s., suite 101,
P.O. Box 560, Kirkland, WA 98083
sadler/Barnard' Associates, Inc.
ATTN: Tom Kucharski, 31218 Pacific Highway S.,
Federal Way, WA 98003
Larry Calvin
Triad Associates, 11415 N.E. 128th st., Kirkland, WA
98034
Resident
'17233 - 140th Ave. S.E., 15, Renton, WA 98058
Gail Bruce
P.O. ~~x 97015, Bellevue, WA 98009-9715
King county Conservation District
steve Townsend, BALD D.I.U.
9