Loading...
Res 90-035! «� � 0072.190.004 DAS/crd 05/16/90 � RESOLIITION NO. 90-35 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING ' THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND TIiE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the City Council of the City of Federal Way hereby adopts a Comprehensive Street Program, including an arterial street construction program, and WHEREAS, the City Council has determined current and future City street and arterial needs, and based upon these findings has prepared a Six-Year Transportation Improvement Program for the ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six-Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six-Year Transportation Improvement Program, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON, HEREBY RESOLVES AS FOLIAWS: Section 1. Proqram Adonted. The Six-Year Transportation Improvement Program for the City of Federal Way, for the ensuing six (6) calendar years (1991-1996, inclusive), a copy of which is attached hereto as Exhibit A and incorporated DAS00007F -1- ORIGlNA� 7 ♦ � � ! i herein by this reference as if fully set forth, which Program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Proqram. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this resolution forthwith, together with the Exhibit attached hereto, with the Secretary of Transportation and a copy with the Transportation Improvement Board for the State of Washington. RESOLVED by the City Council of the City of Federal Way this 26th day of J'�e , 1990. APPROVED: MAYOR, DEBRA ERTEL '/AUTHENTICATED: CITY CLERK, MAUREEN . SWANEY FILED WITH THE CI CLERK: June 26, 1990 PASSED BY THE CI Y COUNCIL: June 26, 1990 RESOLUTION NO. 90=�5 DAS00007F -2- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF FEDERAL WAY Project Priority: Location: Limitss Length: ADT (1988): 9►;�:11; � Federal Way Six-Year Transportation Improvement Program • 1 SW 356th Street lst Avenue South to 21st Avenue SW 1.35 miles 13, 279 @ lst Avenue South (west leg) 11,425 @ 21st Avenue SW (east leg) Existing Conditions: - This urban arterial improvement will be designed and constructed by King Counry with funds previously committed to the project by the Transportation Improvement Board and King County. Due to escalating project costs which exceed the County's commitment, the City of Federal will be required to participate in the project if it is to be implemented. Proposed Imprnvements: Widen e�osting two-lane roadway to five lanes including a continuous two-way left-tum lane, curb and gutters, sidewalks, bike lanes, retaining wall, drainage, illumination, landscaping, a new signal at lst Avenue South and modification of the e�sting signal at 21st Avenue SW. Estimated Costs: Federal Way Share $ 556,550 (Total Project Cost = $5,266,000) _ � • Project Priority: 2 Location: South 356th Street Limits: lst Avenue South to SR99 Length: 0.50 miles ADT (1988): 11, 970 @ lst Avenue South (east leg) Existing Conditions: This urban arterial improvement will be designed and constructed by King County with funds previously committed to the project by the Transportation Improvement Board and King County. Due to escalating project costs which exceed the County's commitment, the City of Federal will be required to participate in the project if it is to be implemented. Proposed Improvementss Widen e�asting two-lane roadway to five lanes with a continuous two-way left-turn lane, curb and gutters, sidewalks, bike lanes, retaining wall, drainage, illuminarion, landscaping, a bridge crossing the Hylebos wetland, and modification of the existing signal at SR99. Estimated Costs: Federal Way Share $ 382,443 • (Total Project Cost = $3,507,000) 0 2 I _ � • • - Project Priority: 3 - Location: 16th Avenue South I,imits: South 348th Street to SR99 Length: 0.52 miles ADT (1988): 18,000 @ South 348th Street Existing Conditions: � This urban arterial improvement will be designed and constructed with FAUS (Federal Aid Urban System) and King County funds which have been previously committed to the projec�t. If escalating project costs exceed the County's commitment, the City of Federal Way may be required to participate in the project if it is to be implemented. Proposed Improvements: Widen e�sting two-lane roadway to five lanes including a continuous two-way left-turn lane, a sixth lane at South 348th Street for dual left turns, curb and gutters, sidewalks, drainage, illumination, landscaping, and realignment of the intersection at SR99 with a new signal system. Estimated Costs: - � " Federal Way Shaze $ 0 (Total Project Cost = $ 3,430,000 0 3 I _ . .: ,., _ _ . . - _ • Project Priority: • 4 Location: Comprehensive Transportation Plan Limits: City-Wide Length: ADT (1988); � Proposed Study: Develop a data base for the e�sting transportarion system throughout the City; develop and calibrate a transportation computer model; develop a land use data base for the computer model; identify and evaluate future transportation improvements; address funding alternatives to implement the improvements on a prioriry basis; develop a system for assessing impact fees or mitigation measures related to private development and its effect on the City's transportation system; provide environmental documentation that is consistent with SEPA requirements; and provide ample opportunities for the general public and local interest groups to participate in the planning process. The final plan wiYl include recommendations to incorporate existing transportation components with new facilities to provide a complete transportation system which is able to accommodate Federal Way's anticipated growth and development. The Comprehensive Transportation Plan will be multi-modal, including public transit, ride-sharing, bicycles, pedestrians, as well as vehicular traffic. Estimated Costs: Engineering Construction Right-of-Way TOTAL $ 150,000 $ 150,000 4 __ • • Pmject Priority: Location: Limits: Length: ADT (1988): TQTAL $ 1,945,000 5 South 312th Street SR 99 to 28th Avenue South 0.70 mile 11,688 @ SR 99 4,869 @ 28th Avenue South Existing Conditions: • Paved 8-foot shoulder on south side only s Limited sigbt distance east from 20th, east from 22nd, and west from 23rd • Illumination on Power Poles Proposed Improvements: Reconstruct e�sting two-lane road to a four-lane roadway with a continuous two-way left-tura lane, a right-tum-only lane at SR99 &om westbound South 312th Street, curbs and gutters, S.S-foot sidewallcs, 5-foot bike lanes, channelization, illumination, modification to signal at SR 99, aew signal at 28th Avenue South, drainage and landscaping. Estimated Costs: _ Engineering $ 235,000 � Construction $ 1,530,000 Right-of�Way $ 180,000 �� - ---- -- . -- :--- •. _ . _ . _ _ Project Priority: Location: Limits: Ixngth: ADT (1988}: � 6 • Southwest 312th Street SR 509 (Dash Point Road) to lst Avenue South 1.00 mile 9,503 @ SR 509 13,187 @ lst Avenue South Existing Conditions: • Concrete pavement • 6-foot to 8-foot paved shoulder - north side • 6-foot to 8-foot gravel shoulder - south side • Illumination on power poles Proposed Improvements: Reconstruct existing two-lane road to a four-lane raadway with a continuous two way left-tum lane, channelization, curb and gutters, 5.5-foot sidewalks, 5-foot bike lanes, landscaping, drainage, modifica- tion to signal at SR 99, and illuminatioa Also include channelization and sidewalks on 14th Avenue S.W. near Lakota Junior High School. Estimated Costs: Engineering Construction Right-of-Way M��� 1��. � $ 320,000 $ 2,180,000 $ 220,000 $ 2,720,000 0 _ . --- ^-- - .__�_...._ -. . :_. r:----- � - . . • . Project Priority: 7 - Location: lst Avenue South Limits; South 320th Street to South 316th Street Length: 0.25 mile � ADT (1988): 16,962 @ 320th Existing Conditions: • Two lanes with paved shoulders • North and south of the project limits the roadway is improved to five lanes with curb, gutter and sidewalk Proposed Improvements: Reconstruct existing two-lane arterial to a four-lane roadway with a continuous twc�-way, left-tum lane, curbs and gutters, eight-foot sidewalks, five-foot bike lanes, landscaping, drainage, illumination, modification to signal at South 320th Street, and modification to the fire signaL Estimated Costs: Engineering $ 115,000 Construction $ 635,000 Right-of-Way $ 10,000 TOTAL $ 760,000 7 __ • . Project Priority: Locations: Limits: E:3 21st Avenue S.W./SR 509 S.W. 320th Street to SR 509 (Dash Point) 21st Avenue S.W. to S.W. 312th Street Length: 0.68 mile ADT (1988): 14,829 @ 320th Existing Conditions: . � • Two wide lanes with curb, gutter and sidewalks • Sidewalks are not continuous • Proposed Imprnvements: Reconstruct existing roadway to four through lanes with a continuous two-way left-turn lane except where e�sting landscaped median exists near S.W. 320th Street, curbs and gutters, SS-foot sidewalks, five-foot bike lanes, drainage, illumination, landscaping, and new signal at SR 509. Estimated Costs: Engineering $ 235,000 Construction $ 1,530,000 Right-of-Way $ 300,000 TOTAL $ 2,065,000 . 8 . . . - ----- _ __ ___._. _ .._ .__ . _ ._ ----. -.-. -. . -_ .. . - � Project Priority: 9 - Location: SR 509 (Dash Point) Limits: S.W. 312th Street to SR 99 Length: 228 miles ADT (1988): No ADT for SR 509 Existing Conditions: � Narrow, two-lane roadway with substandard horizontal and vertical alignments. Proposed Impmvements: Perform traf5c counts, obtain accident history, conduct sight distance surveys, and develop arterial improvement/safety needs analysis together with estimated costs to construct improvements. Develop list of prioritized projects along this corridor for inclusion in future six-year transportation improve- ment programs. Estimated Costs: Engineering $ 190,000 - Construction $ 0 Right-of-Way $ 0 TOTAL $ 190,000 9 I _ .__ . . .. ._: .. __.... . _ . -- ------, —.:_. _ _ _ _ _ _ - --- - - _ • - � _ - Project Priority: 10 - - - Location: Military Road South Limits: South 304th Street to Star Lake Road Length: _ - - - 1.58 - - _ _ ADT (1988): 10,650 @ South 304th Street � 15,674 @ Star Lake Road Existing Conditions: • Two-lane concrete pavement • 6-foot to &foot paved shoulders � Illumi.nation on power poles Proposed Improvements: � Widen e�sting two-lane roadway (S lanes at South 288th Street) to S lanes between Star Lake Road and South 288th Street and to 3lanes south of 288th to South 304th Street, curb and gutters, 5.5-foot sidewalks, 5-foot bike lanes, drainage, illumination, landscaping, and modification to signal at South 304th Street Estimated Costs: � Engineering $ 425,000 Construction $ 2,995,000 iugbt-of w� $ 29s,000 TOTAL $ . 3,715,000 10 . � Project Priority: Locations: Limits: Length: ADT (1988): 11 • - _ 23rd Avenue South South 317th Street 28th Avenue South South 320th Street to South 317th Street 23rd Avenue South to 28th Avenue South South 317th Street to South 304th Street 1.19 miles 8,226 @ South I.eg of 28th Avenue South and 30th Street Intersection 13,945 @ North Leg 23rd Avenue South and South 320th Street Existing Conditions: • Mostly residential with some waterfront homes on the west side • Serves commercial area south of South 317th Street • Two lanes with 6-foot to 8-foot gravel shoulders north of South 317th Street • Two lanes to three lanes with curb and gutter 317tht23rd • Illumination on power poles Proposed Improvements: Reconstruct e�sting roadway to three lanes (two through lanes with continuous two way, left-turn lane), curbs and gutters, eight-foot sidewalk on 23rd Avenue South and on South 317th Street, 5.5- foot sidewallc on 28th Avenue South, five-foot bike lanes, channelization, drainage, illumination and landscaping. , Estimated Costs: Engineering $ 275,000 Construction $ 1,825,000 Right-of-Way $ 305,000 TOTAL $ 2�405�000 11 � • --- Project Priority: Location: 12 I-5 Interchange Study Limits: --- Length: --- ADT (1988): Existing Conditions: Existing full-diamond interchanges at South 272nd Street and at South 320th Street. F�sting clover- leaf interchange at SR-18 (South 348th Street). Proposed Improvements: Investigate the need for a new interchange on I-5 within the city limits of Federal Way. Study to include traffic volume projections, circulation/access needs, geometrics consideration, coordination with WSDOT and FHWA and preparation of planning-level cost estimates. Estimated Costs: Engineering $ 23Q000 . Construction $ � Right-of-Way $ 0 TOTAL $ �0,� A 0 12 Project Priority: Location: Limits: Length: ADT (1988): . 13 • - _ lst Avenue South South 356th Street to South 348th Street 0.46 mile 4,337 @ South 348th Street 4,437 @ South 356th Street Eldisting Conditions: • Two lanes with 6-foot to &foot gravel shoulders • Intersection at South 356th being improved by King County project • West side of the roadway, south of South 348th, has been recently improved with curb, gutter and sidewalk for half of the four-lane section Proposed Improvements: Widen e�sting two-lane roadway to four lanes with curbs and gutters, SS-foot sidewalks, five-foot bike lanes, left-tum channelization at South 348th Street and South 356th Street, drainage, �lumi- nation and landscaping. Estimated Costs: Engineering $ 153,Q00 Construction $ 945,000 Right-of: Way $ 175,000 . TOTAL $ 1,275,000 13 • Project Priority: Location: Limits: Length: ADT (1988): 14 South 304th Street SR 99 to Military Road South .72 mile 3,117 @ SR 99 11,155 @ Military Road South . - Existing Conditions: • Two lanes • Three- to four-foot paved shoulders • Illumination on power poles � • Commercial land use at SR 99 • Several entering sight distance restrictions Proposed Improvements: Reconstruct existing two-lane roadway to two through lanes and a continuous two-way left-turn lane, curbs and gutters, 5.5-foot sidewalks, five-foot bike lanes, channelization for five lanes at SR 99, dra�jnage, illumination, landscaping, and modifications to signal at SR 99. Estimated Costs: Engineering $ 175,000 Construction $ 1,085,000 Right-of-Way • $ 200,000 TOTAL $ 1,�,� 14 • _ � - - Project Priority: 15 - Location: SR 161 Limits: I-5 to South 348th Street Length: 0.73 mile � ADT (1988): No counts Existing Conditions: • Five lanes at South 348th Street • Curb, gutter and sidewalk on east side in front of Costco • Mostly paved shoulders • No illumination • Awkward intersection at 16th Avenu� South • � Two-lane structure crossing I-5 Proposed Imprnvements: Widen e�sting roadway to five lanes between South 348th Street and South 356th Street and then taper to two lanes south of South 356th Street to I-5, curbs and gutters, channelization, eight-foot sidewalks, five-foot bike lanes, drainage, illumination, landscaping and guardrails. Estimated Costs: Engineering Construction Right-of-Way TOTAL $ 215,000 $ 1,380,000 $ 100,000 $ 1,695,000 15 • -� Project Priority: 16 Location: South 336th Street Limits: SR 99 to I-5 Length: 0.47 mile ADT (1988): 7,812 @ SR 99 Existing Conditions: • Two lanes � &foot gravel shoulders • Development east of 28th has improved to half of four-lane section on the north side Proposed Improvements: Reconstruct existing roadway to five lanes beiween SR 99 and 20th Avenue South, and to three lanes between 20th Avenue South and I-5 with curbs and gutters, &foot sidewalks; SR 99 to 20th Avenue South, SS-foot sidewalks; 20th Avenue South to I-S, five-foot bike lanes, drainage, illumination and landscaping. Estimated Costs: Engineering $ 155,000 . Construcdon $ 935,000 Right-of-Way $ 18U,000 TOTAL $ 1,270,000 16 �_ • Project Priority: 17 Location: South 356th Street j,imits; SR 99 to 16th Avenue South Length: 0.44 mile ADT (1988): No counts Existing Conditions. • Two lanes • Gravel shoulders • Skewed intersection at SR 99 • King County has conducted route study Proposed Improvements: Construct a five-lane roadway on new alignment with curbs and gutters, 8-foot sidewalks, five-foot bike lanes, drainage improvements, landscaping, illumination, a new signal at SR 161 and modification to the e�sting signal at SR 99. King County has conducted an alignment study for this project. Estimated Costs: Engineering $ 195,000 Construction $ 1,210,000 � Right-of-Way $ 315,000 _ TOTAL $ 1,720,000 17 • -_ � - Project Priority: - 18 Location: SR 99 Limits: South City Limits to North City Limits Length: _ ADT (1988): _ E�sting Conditions: WSDOT is preparing a route development study for SR 99 from the Pierce County/King County line to the Ciry of Burien. These project limits include the entire portion of SR 99 that lies within the city limits of Federal Way. The WSDOT's study proposal widening SR 99 from typically a five-lane roadway section with paved shoulders to a seven-lane roadway with curbs, gutters and sidewalks. Proposed Improvements: Review WSDOT's study documents and coordinate with them to ensure Federal Way has meaningful input into the planning efforts for SR 99 through the city. Considering the high level of commercial interest that would be affected by this WSDOT project, a citizen's advisory committee should be included to guide the State's efforts. , Estimated Costs: Engineering $ 100,000 Construction $ 0 xighc-of-way $ o TOTAL $ 100,000 18 - � _ � - Project Priority: 19 Location: Dash Point Road Limits: Pierce County line to 21st Avenue S.W. I.ength: ADT (1988): A . Existing Conditions: Narrow two-lane roadway with substandard horizontal and vertical alignments. Proposed Improvements: Perform traffic safety study to identify high accident/high hazard locations. Develop list of safery improvement projects with estimated implementation costs and prioritize projects for inclusion in future six-year transportation improvement programs. Estimated Costs: Engineering $ 130,000 Construction $ 0 Right-of. Way $ 0 TOTAL $ 130,000 19 _ • - • - Project Priority: 20 Location: 16th Avenue S.W. Limits: S.W. 308th Street to S.W. 3D4th Street Length: 0.29 mile ADT (1988): No counts Existing Conditions: • Serves Adelaid School • Curb, gutter and sidewalks on east side � • Wide, unstriped residential roadway section at the school , • Narrow right-of-way 306th to 307th Proposed Imprnvements: Add curb and gutter, 5.5-foot sidewalks, and five-foot bike lane on the west side of the e�sting two- lane residential roadway with new enclosed drainage system where needed. Estimated Costs: Engineering $ SU,000 Construction $ 235,000 Right-of-Way $ � TOTAL $ �,� 20 � � Project Priority: 21 Location: 4th Avenue South Limits: South 316th Street to South 312th Street Length: 034 mile ADT (1988): No counts E�sting Conditions: • Two lanes with no shoulders • Residential becomes rolled curb and sidewalk &om South 316th Street to the south Proposed Improvements: Install rolled curb, 5.5-foot sidewalks and five-foot bike lanes on both sides of the e�sting two-lane residential roadway with channelization for a left-tum lane at South 312th Street and a new enclosed drainage system. Estimated Costs: Engineering $ 60,000 � Construction $ 300,000 ' x�ght-of wa $ o TOTAL $ 360,000 21 City/ County federal way/Ki�g County SIX TEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Hearing Date: June 26,1990 City No. 0443 Adoption Date: June 26,1990 County No. 17 Resolution No.: 90-35 ______________________________________________________=__� ==__� ==__==°=_=====___=� __� "====___=__=_____==---__====_==________==____====__°===__________=__� __====— �=====°=== F P PROJECT IDENTIFICATION m T C�f) PROJECT COSTS IN THOUSANDS OF DOILARS ( � �� IN TNOUSANDS S �� U r a 0 A�U� � � � � �� �� N i DESCRIPTION OF WORK jo work T L R�N) OBLIGATION �TOTAI � fUNDING Sd1RCE I I IIFEDERAL OBLIGATION�� C o f code A E R�D� SCNEDULE I I ------------------------- I I (I P�N _II TC r (Street name or number, c (s) L N Y� � Y E A R �FUNDS � �FEDERAL � CAPP, � �FEDERAL ��'" ""'"""----"-" �� NL i Co. road name or number, lw G O�S� --------- ( �Local � � RAP, �UTILITY�AID �� �FIRST �2ND �� LA t termini beginning & end. ao T V�T�1st 2nd 3rd 5TH � � �Prog/Amt� TIA, �CODES (PROJECT �� �`fEAR �THRU �� S y Describe work to be done.) sr N E�A� & 8� � � � � UATA � �NUMBER �� �ANNUAL�6TH �� � No sk R�T� 4TH 6th � � � �Prog/Amt� I (� �ELEMT.�YEARS�� 3 4 � 5 6 �7�8� 9 10 11 12 � 13 � 74 � 15 � 16 �17 �18 �� �19 �20 �� -----?-----------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 16 1 Sv 356th Street from 1st Ave S to 21st Ave SY - Widen 2 ABDF 1.35 F 557 557 557 GPTSY ��P•E. � � �� existing two-lane rdadway to 5-lanes including a GHIJ IIR�W � � �� continuous left-turn lane, curb and gutters, sidewalks, IQ�10 iiCONST I II bike Lanes, retaining wall, drai�age, illuninati�, TOTAL landscaping, a new signat at 1st Ave S and modification �� � � �� _____ the existing signal at 21st Ave SW. �� � � �� -------------------------------------------------------------------------------------------------------•-------------------------------------------------��------------------�� 16 2 S 356th Street from 1st Ave S to SR-99 - Yiden existing 2 ABDF 0.50 F 383 383 383 GPTS1�1 (�P.E. � � �� two -lane roadway to 5-lanes with a continuous Left- GHIJ ��R�u � � �� turn lane, curb and gutters, sidewalks, bike lanes, KLMO iiCONST I II retaining wall, drainage, ill�nination, landscaping, a TOTAL bridge crossing the Hylebos wetland, and modificatia� �� � � �� _ -____- of the existing signal at SR-99. II � � �� ----------------------------------------------------------------------- ---------------------------------------------------------------------------------- �I ------------------ �� 14 3 16th Ave S from S 348th Si to SR-99 - Yiden existing 2 ABDF f 0 0 0 GPTSN ��P.E. � � ��i . roadway to 5-lanes inctuding a continuous two-way left- GHIJ (Punding previously ca�mitted IIR�u � � � turn lane, a sixth lane at S 348th St for dual left IQA through FAUS and King Co�ty) II�NSTI � � turns, curb and gutters, sidewalks, drainage, (�TOTAL� I � ill�xnination, landscaping, and realigrnient of the �� � � � intersection at SR-99 with a new signal system. �� � � � --------------------------------•--------------------------------------------------------------------------------------------------------------------------------��------------------� Comprehensive Transportation Plan - Develop a data base for the existing transportation system throughout the city; develop and calibrate a transportation canputer model; develop a land use data base for the model; identify and evaluate future transportation i�rove- ments; address funding alternatives to implement the alternatives on a priority basis; devetop a system for assessing impact fees or mitigation measures related to 150 150 150 GPTSW ��P.E. ( � � R� � ��CONST� ��TOTAL� �� ( �� � (� � �� � City/ County Federal Way/King County SIX YEAR TRANSPORTATI�1 IMPROVEMENT PROGRAM 1991 TO 1996 Hearing Date: June 26,1990 City No. 0443 Adoption Date: June 26,1990 County No. 17 Resolution No.: 90-35 ------------------------------------------------------------------------------------------------------- F P PROJECT IDENTIFICATION m T C�F� PROJECT COSTS IN THOUSANDS OF DOILARS � I II IN TNWSANDS f II U r a 0 A�U� � � � � �� �� N i DESCRIPTION OF HORK jo work T L R�N� OBLIGATION �TOTAL � FUNDING SOURCE I I IIFEDERAI OBIIGATiON��' C o f code A E R �D � SCHEDULE I I"""""'""'"" I I I I P�N ( I TC r (Street name or number, c (s) L N Y� � Y E A R �fUNDS � �FEDERAL � CAPP, � �FEDERAL (�"-" "'"" "'"" '"'�� NL i Co. road name or number, lw G O�S� --------- � �Lxal � � RAP, �UTILITY�AID �� �fIRST �2ND �� LA t termini beginning & end. ao T V�T�1st 2nd 3rd 5TH � � �Prog/Amt� TIA, �CODES (PROJECT �� �TEAR �THRU ��'. S y Describe work to be done.) sr H E�A� & & � � � � UATA � �NUMBER (� �ANNUAl�6TH ��, � No sk R�T� 4TH 6th � � I IProg/Amt� � �� �ELEMT.�YEARS�� 2 -- 3 4 � 5 6 �7�8� 9 10 11 12 � 13 � 14 � 15 � 16 �17 �18 �� �19 �20 �� ---------------------------------------------------------- ----------------------------------------------------------------------------------------------------��------------------�� private developnent and its effect on the City�s trans- �� � � �� portation system; provide envirorn�ental docunentation �� � � �) that is consistent with SEPA requirements; and provide �� � � �� ample opportunity for public participation in the �� � � �� ptanning prxess. �� � � �� --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 17 5 S 312th St from SR-99 to 28th Ave S- Reconstruct existing two-lane road to provide four through l�es with a continuous two-way left-turn lane, a right-turn- only lane at SR-99 from westbound S 312th St, curbs and gutters, sidewalks, bike lanes, channelization, ill- lunination, modification to signal at SR-99, new neu signal at 28th Ave S, drainage and landscapirLq. ABDF 0.70 U 1,945 GHIJ 10� 1,945 400 1,545 GPTSU ��P.E. � ��R/u � IICONST� IITOTAL� �) � �� � �� � ■ r 16 6 S41 312th St from SR-509 to 1st Ave S- Reconstruct existing road to provide four thraigh tanes and a � continuous two-way left-turn lane, charnelizatian, curb and gutter, sidewalks, bike lanes, landscaping, drainage, illunination, modification to signal at SR-99. Also includes channelization and sidewalks on 14th Ave SW, near Lakota Jr. High School. ABDF 1.00 U 320 2,400 GHJK MO 2,720 1,220 1,500 GPTSU ��P.E. � I I RiW I ��CONST� ��TOTAI� ■ ■ 16 7 1st Ave S from S 316th St to S 320th St - Recorstruct 2 ABDF 0.25 U 760 760 300 460 GPTSW ��P•E• � � � existing two-lane arterial to a four-lane roadway with GIJK ��R/W � � � a continuous two-way left-turn lane, cu�bs and gutters, MO ��CONST� � � sidewalks, (andscaping, drainage, illunination, ��TOTAL� � � modification to the signal at S 320th St and �� � � � modification to fire signal. �� � � � -------------------------------------------------------------------------------------------------------------------------- ---------------------------------------��----------------- City/ County Federat Way/King County SIX TEAR TRANSP�tTATI�I IMPROVEMENT PROGRAM 1991 TO 1996 Hearing Date: June 26,7990 City No. 0443 Adoption Date: June 26,1990 County No. 17 Resolution No.: 90-35 �_______ ____ __�=____=�_==s_==:� _ __=====a==__ =_ =_=_=a__ =a_a_=__as=_a_ __====e=__a=oo_ =__ o=aos==e___o_�mo==aa=ea_ ===_a=�a_ =__�=a_ __°_ =-===oa=__a=_ ===o_�o=_a=_=_s___ I F P PROJECT IDENTIFICATION m T C�F� PROJECT COSTS IN THWSANDS Of DOILARS � ( �� IN TfiOUSANDS S �� '' U r a 0 A�U� � � ( ( (� I� N i DESCRIPTIqi OF 1JORK jo work T L R�N� OBLIGATI�I �TOTAL � FUNDING SWRCE � � IIFEDERAL OBLIGATI�i�� C o f code A E R�D� SCHEDULE � �-------------------------� � �I P�N II TC r (Street name or number, c (s) L N T� � Y E A R �FUNDS � �fEDERAL � CAPP, � �FEDERAL ��------------------�� I �� NL i Co, road na�ne or n�iber, lw G O�S� --------- � �Local � � RAP, �UTILITY�AID �� �FIRST �2ND �� ' LA t termini beginning & end. ao T V�T�7st 2nd 3rd 5TH � � �Prog/Amt� TIA, �CODES �PROJECT �� �TEAR �THRU �� � S y Describe a+ork to be done.) sr H EIAI & 8 � � � � UATA � �NI�IBER �� �ANNUAL�6TH �� � No sk R�T� 4TH 6th � � I IProg/Amtl � �� �ELEMT.�YEARS�� 2 --- � 5 6 �7�8� 9 10 11 12 � 13 � 14 � 15 � 16 �17 --- �19 �20 �� -------------------------------------------------------- ------------------------------------------------------------------------------------ ��------------------�� lane roadWay on new alignment with curbs and gutters, GHIUI ��R/W � � �� sidewalks, drainage improvements, landscaping, illunin- 0 ��CONST) � �) ation, new signal at SR-161 and modifications to ��TOTAL� � �� existing signal at SR-99. King Co�ty has conducted an II � � �� aligrnient study for the project. �� ( � �� ------------------------------------------------------------------------------------ -----------------------------------------------------------------------------��------------------�� 14 18 SR-99 through the City of Federal Way - Review WSDOT U U 10 90 100 100 ��P•E• � � (� study docunent and coordinate with WSDOT to ensure ��R/W � � �� Federal 41ay has meaningful input into the planning ��CONST� � �� efforts for SR-99 through the city. ��TOTAL� � �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 16 19 Su Dash Point Rd fram from Pierce co�ty line to 21st U U 130 130 130 ��P•E• � � �� Ave SY - Perform traffic safety study to identify high ��R/Y � � �� accident/high hazard locations. Develop a list of ��CONST� � �� safety improvement projects with estimated implemen- ��TOTALI � (� tation costs and prioritize projects for inclusion in �� � � �� future six-year transportation improvement programs. �� � � �� •-----------------------------------------------------------------------------------------------------------------------------------------•--------------------��------------------�� 19 20 16th Ave SW from SW 304th St to S41 308th St - Add 3 ABDF 0.29 U 285 285 285 ��P•E• � � �� curbs, gutters, and sidewalks on the �aest side of the GO ��R/u � � �� existing two-lane residential roadway with new enclosed ��CONST� � �� drainage system where needed. ��TOTALI � �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 19 21 4th Ave S fram S 312th St to S 316th St - Install 3 ABDF 0.34 U 360 360 360 ��P•E• � � �� rolled curb and sidewalks on both sides of the existing GHO ��R/Y � � �� two-lane residential roadway with chamelization for a ��CONST� � �� left-turn lane at Su 312th St and a nere enclosed (�TOTAI� � �� drainage system. �� � � �� � -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� City/ County Federal Way/King County City No. 0443 County No. 17 SIX TEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Hearing Date: Jw�e 26,1990 Adopti� Date: June 26,1990 Resolution No.: 90-35 _____________________________________________ __ ___ ___________'�'==__-----:______� ==_=_-� -----___=� ---------_ -- _---_----==='==_ �==______� ='_°==_=___=____=_=_=� =_=°----_ F P PROJECT IDENTIFICATION m T C�F� PROJECT COSTS IN THWSAlOS OF DOLLARS I � (� IN THOUSANDS S �I U r a 0 A�U) � � � � �� �� N i DESCRIPTION OF WORK jo work T L R�N� OBLIGATION �TOTAL � FUNDING SOURCE I I IIFEDERAL OBLIGATION�� C o f code A E R�D� SCHEDULE � �-------------------------� � �� PLAN II TC r (Street name or nunber, c (s) L N Y� � Y E A R �fUNDS � (FEDERAL � CAPP, � �FEDERAL ��""""" """""""""'"�� NL i Co. road n�ne or nunber, lw G O�S� """"""'"- � �Local � � RAP, �UTILITY�AID �� �FIRST �2ND �� LA t termini beginning 8 end, ao T V�T�1st 2nd 3rd 5TN � � IProg/Amt� TIA, �CODES �PROJECT (� �YEAR �THRU �� S y Describe work to be done.) sr H E�A� � & � � � � UATA ( �NUMBER �� �ANNUAL�6TH �� � No sk R�T� 4TH 6th � � I �Prog/Amtl � �) �ELEMT.�YEARS�� 2 3 4 � 5 6 �T�8� 9 10 11 12 � 13 � 14 � 15 � 16 �17 �18 �� �19 �20 �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� erations, coordination with WSDOT and FHWA, and �� � � �I preparation of planning-level cost estimates. �� � � �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 16 13 tst Ave S from S 348th St to S 356th St - Widen 2 ABOF 0.46 U 1,275 1,275 400 875 GPTSU ��P•E• � � �� existing two-tane roadway to 4-lanes with curbs and GHJK ��R/w � � �� gutters, sidewalks, left-turn charmelization at S 348th MO ��CONST� � (� and S 356th streets, drainage, illunination and ��TOTAL� � �� landscaping. �� � � �� --------------------------------------------------------------------------------------------------•--------------------------------------------------------------��------------------�� 17 14 S 304th St from SR 99 to Military Rd S- Reconstruct 2 ABOf 0.72 U 1,460 1,460 500 960 GPTSW ��P-E• � � �� existing two-lane roadway to two through lanes and a GHIJ IIR�W � � �� continuous two-way left-turn lane, curbs and gutters, pA0 ��CONST� � �� sidewalks, channelization for 5-lanes at SR-99, ��TOTAL� � �� drainage, illunination, landscaping and modifications �� � � �� to sisnal at sR 99. �I I � �� ----------------------------------------:------.--.--------------------------------------------------------------------------------------------------------------��------------------�� • 15 SR 161 fran S 348th St to I-5 W�den existing roadway 2 ABDF 0.73 U 1,695 1,695 710 985 GPTSN ��P•E• � � �� to five-lanes between S 348th St and S 35fith St and 6HJK (�R/W � ( �� then taper to two lanes south of S 356th to I-5, curbs 1� ��CONST� � �� and gutters, channelization, sidewalks, drainage, IIT�TA�I � �� itlunination, landscaping and guardrails. �� � � �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 16 16 S 336th St fran SR-99 to I-5 - Reconstruct existing 2 ABOF 0.47 U 1,270 1,270 500 770 GPTSW ��P•E• � � �� roadr►ay to five-lanes between SR 99 and 20th Ave S and GHIJ ��R/W � � �� to three-la�s between 20th Ave S and I-5, with curbs ICMO ��CONST� � �� and gutters, sidewalks, drainage, illunination and ��TOTAL� ( �� landscaping. �� � � �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 16 17 S 356th St from SR-99 to 16th Ave S- Construct five- 1 ABDf 0.44 U 1,720 1,TL0 725 995 GPTSW ��P•E• � � �) � City/ County Pederal Yay/King County City No. 0443 County No. 17 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Hearing Date: June 26,1990 Adoption Date: J�e 26,1990 Resolution No.: 90-35 _______________________ _________ __________________==____=_=____=°==_= �__=________� =______=____= �=__==____- =_====__=__=__==__==========_==__=_=____===_=__===� =_�-===_===___= F P PROJECT IDENTIFICATIOPI m T C�F� PROJECT COSTS IN THOUSANDS OF DOLLARS a 0 A�U� � � IN TNOUSANDS S N i DESCRIPTION OF WORK jo work T L R�N� OBLIGATION �TOTAL � FUNDING SOURCE � � IIfEDERAL 08LIGATION�� C o f code A E R�D� SCHEDULE � I""""""'""'" """"""""I I II P� (I TC r (Street name or number, c (s) L N Y� � Y E A R �FlJNDS � �FEDERAL � CAPP, � �fEDERAI �� """" """"-"-"""�� NL i Co. road name or number, l++ G O�S� --------- � �Lxat � � RAP, �UTILITY�AID �� �FIRST �2ND �� LA t termini beginning & end. ao T V�T�1st 2nd 3rd 5TH � � �Prog/Amt� TIA, �CODES �PROJECT �� �VEAR �THRU �� S y Describe work to be done.) sr H EIAI & & � � � � UATA ( �NUMBER �� �IUitNJAl�6TH �� � No sk R�T� 4TH 6th � � I IP�°9�AmtI � �� �ELEMT.�YEARSII 1 2 3 4 � S 6 �7�8� 9 10 11 12 � 13 � 14 ( 15 � 16 �1T �18 �� �19 �20 �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� erations, coordination with WSDOT and FHWA, and (� � � �� preparation of plannir�g-level cost estimates. �� � � �) -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 16 13 tst Ave S from S 348th St to S 356th St - Widen 2 ABDF 0.46 U 1,275 1,275 400 875 GPTSW (IP•E• I � �� existing two-lane roadway to 4-lanes ++ith curbs and GHJK ��R/W � � �� gutters, sidewalks, teft-turn channelization at S 348th MO ��CONST) � �� and S 356th streets, drainage, illunination and ��TOTAL� � �� landscaping. �� � � �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 17 74 S 304th St from SR 99 to Military Rd S- Reconstruct 2 ABDP 0.72 U 1,460 1,460 500 960 GPTSY ��P.E. � � �� existing two-lane roadway to two through lanes and a GHIJ ��R/W � ( �� continuous two-way left-turn lane, curbs and gutters, KMO ��CONST� � �� sidewalks, channelization for 5-lanes at SR-99, (�TOTAL� ( �� drainage, illunination, larxJscaping ar�d modifications �� � � �) to signal at SR 99. I� � � �� � -- ------------------------------------------------�-------Y ---------------------------------------------------------------------------------------------------��------------------�� • 15 SR 161 fram S 348th St to I-5 - Yiden existi roadwa 2 ABDF 0.T3 U 1,b95 1,695 T10 985 GPTSW ��P•E• � � �� to five-lanes between S 348th St and S 356th St and GHJK ��R/W � � �� then taper to two lanes south of S 356th to I-5, curbs MO ��CONSTI � �� and gutters, charv�elization, sidewalks, drainage, ��TOTAL� � �� illunination, landscaping and guardrails. �� � � �) -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 16 16 S 336th St fran SR-99 to I-5 - Reco�truct existing 2 ABDF 0.47 roadway to five-lanes between SR 99 ard 20th Ave S and GHIJ to three-lanes betWeen 20th Ave S and I-5, with curbs Ia10 and gutters, sidewalks, drainage, illunination and landscaping. 1,270 1,270 500 770 GPTSW ��P.E. ��R/W � � (�CONSTI I (�TOTAL� � (� � � -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------ 16 17 S 356th St from SR-99 to 16th Ave S- Construct five- 1 ABDF 0.44 U 1,720 1,720 725 995 GPTSY ��P.E. � City/ County Federal liay/King County SIX TEAR TRANSPORTAT[ON IMPROVEMENT PROGRAM 1991 TO 1996 Hearing Date: June 26,1990 City No. 0443 Adoption Date: J�e 26,1990 County No. 17 Resolution No.: 90-35 _________________ _________ ___________________ __________________________________________ ___________ __________°=====_____====_____==_=_====______=====_=__===___==__==________=_-- F P PROJECT IDENTIFICATION m T C�F� PROJECT COSTS IN THOUSANDS OF DOLLARS I I II IN TNWSANDS S �� N i DESCRIPTION OF tiIORK e � AI�I I I I I II II jo work T L R�N� OBLIGATION �TOTAL � FUNDING SOURCE � � IIFEDERAL OBLIGATION�� C o f code A E R�D� SCHEDULE � �-"'--------------------'I I II P�N II TC r (Street name or number, c (s) L N T� � Y E A R �FUNDS � �FEDERAL � CAPP, � �FEDERAL II "'"""" NL i Co, road name or number, lw G O�S� --------- � �Lxal � � RAP, �UTILITY�AID �� (FIRST �2ND �� LA t termini beginning & end. ao T V�T�1st 2nd 3rd 5TH � � �Prog/Amt� TIA, �CODES �PROJECT �� �TEAR �THRU �) S y Describe work to be done.) sr H E�A� & & � � � � UATA � �NUMBER �� �ANNUAL�6TH �� Na sk R�T� 4TH 6th � � � �Prog/Amt� � �� �EtEMT.�YEARS�� 1 2 3 4 � 5 6 �7�8� 9 10 11 12 � 13 � 14 � 15 � 16 �77 �78 �� �14 �20 �� -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 16 8 21st Ave Su/SR-509 from SW 320th St to SR 509 and 2 ABDF 0.68 U 500 1,565 2,065 900 1,165 GPTSU ��P.E. ( � �� 21st Ave SN to SW 312th St- Reconstruct existing road- GIJK uay to four through lanes with a continuous two-way M IIR/u I I II , CONST left-turn except Where landscaped median exists near ��TOTAL) � �� �' su 320th St, curbs and gutters, siden►alks, landscaping, II I I 'I drainage, illunination and a new signal at SR-509. (I � I II -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 17 9 SW Dash Point Rd from SW 312th St to SR-99 - Perform U 2.28 U 790 190 190 ��p � I �� traffic counts, obtain accident history, sight distar�ce IIR�u � � �� surveys, and develop arterial improvement/safety needs ��CONST� � �� together with estimated costs to construct improvements. ��TOTAL� � �� ----------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------�� 16 10 Military Rd S from S Star Lake Rd to S 304th - Widen 2 ABDF 1.58 U 3,715 3,715 1,630 2,085 GPTS41 ��P•E. � � �� existing roadway (5 lanes at S 288th St) to five lanes GJ10�1 IIR�W ( I II between Star Lake Road and S 288th St, and to three 0 ��CONST� � �� � lanes south of 288th to S 304th St, curb and gutter, ��TOTAL� � �� sidewalks, bike lanes, drainage, landscaping, illunin- (� I ' II ation, and modification to signal at S 304th St. II I I I' -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 17 11 28th Ave S/S 317th St/23rd Ave S from S 304th St to 2 ABDf 1.19 U 2,405 2,405 950 1,455 GPTSW ��P•E• � ( �� S 320th St - Reconstruct existing roadWay to three GHJK � ��R/W � � �� lanes (two through lanes with continuous two-way left- MO ��CONST� � �) turn tane), curbs and gutters, sidewalks, bike lanes, ��TOTAL� � �� channelization, drainage, illunination, and landscaping. '� � ( �I -----------------------------------------------------------------------------------------------------------------------------------------------------------------��------------------�� 11 72 Interchange study along I-5 - Invesitgate the need for U -- U 230 230 230 ��p•E• � � �� a new interchange on I-5 within the city limits of I�R/y I I �I federal Way. Study to inctude traffic votune pro- , ��CONST� � �� jections, circutation/access needs, geometric consid- ��TOTAL� � ��