Res 92-117
RESOLUTION NO. 92-117
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF FEDERAL WAY, WASHINGTON, ADOPTING AN
EXTENDED AND REVISED TRANSPORTATION
IMPROVEMENT PROGRAM FOR 1993-2003 AND
DIRECTING THE SAME TO BE FILED WITH THE
WASHINGTON STATE SECRETARY OF TRANSPORTATION
AND THE TRANSPORTATION IMPROVEMENT BOARD.
(AMENDS RESOLUTION 9l-67).
WHEREAS, pursuant to the requirements of Chapters 35.77
and 47.26 RCW, the city Council of the City of Federal Way adopted
a Transportation Improvement Program on July 23, 1991 (Resolution
No. 91-67); and
WHEREAS, the City Council of the city of Federal Way has
reviewed the work accomplished under the Program and has reviewed
work scheduled to be accomplished according to the updated Program;
and
WHEREAS, a public hearing was held on the Transportation
Improvement Program on August 4,
1992,
in compliance with the
requirements of State laws; and
WHEREAS,
the City Council has determined current and
future
city
street
and arterial
needs,
and based upon these
findings
has
prepared
a
revised
and
extended
Transportation
Improvement Program for the ensuing ten calendar years; and
WHEREAS, pursuant to the requirements of Chapters 35.77
and
47 .26 RCW ,
the City Council
hereby adopts
a revised and
extended Transportation Improvement Program; and
WHEREAS, the City Council finds that there will be no
significant adverse environmental impacts as a result of adoption
COpy
or implementation of this Transportation Improvement Program; NOW,
THEREFORE,
THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
section 1.
Proaram Adopted.
The extended and revised
Transportation Improvement Program for the City of Federal Way for
the ensuing ten (10) calendar years (1993-2003 inclusive), a copy
of which is attached hereto as Exhibit A and incorporated herein by
this reference, which sets forth the City's Transportation project
locations, types of improvements and the estimated costs thereof,
is hereby approved and adopted.
Section 2.
Filina of Proaram.
Pursuant to Chapter 35.77
RCW, the City Clerk is hereby authorized and directed to file a
copy
of
this
resolution,
together
with
Exhibit
A,
with
the
Washington State Secretary of Transportation and a copy with the
Washington State Transportation Improvement Board.
RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY,
WASHINGTON, this 1Ck day of C/O' 1992.
CITY OF FEDERAL WAY
~9.~
MAYOR, ROBERT STEAD
ATTEST:
í
,L ,jc,,~ ~l
-~Y CLERK, MAUREEN M! SWANEY, CMC
-2-
APPROVED AS TO FORM:
~ V"- --r
ACTING CITY ATTORNEY, CAROLYN A. LAKE
FILED WITH THE CITY CLERK: 8/4/92
PASSED BY THE CITY COUNCIL: 8/4/92
RESOLUTION NO. 92-117
LA IKA THLEER \ TIP . RES
-3-
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) 1993 - 2002
Public Works Department
City of Federal Way 4 Augusl 1992
1992 data shown for reference only. Costs for subsequent years are in 1993 dollars x 1,000 and include a 4%/ycar innation factor.
-----,-,-,
1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 TOTAL
Comprehensive Transportation Plan 149 122 271
(I) Dash Point Rd Study - Lakola Plant to 1-5 20 20 40
Heliport Master Plan 40 40
Right of Way Vegetation Plan 30 30
Resuñaclng Program and Emergencies 253 500 520 541 562 585 608 633 658 684 712 6,256
Neighborhood Traffic Management Program 75 100 104 108 112 117 122 127 132 137 142 1,276
Minor Capital Improvement Projects
Wheelchair Ramps, Pedestrian Improvements 30 31 32 34 35 36 38 39 41 43 360
Sidewalk Completion Program 50 52 54 56 58 61 63 66 68 71 600
Streel & Shoulder Pavement Safety Program 100 104 108 112 117 122 t27 132 137 142 1,201
Traffic Signal Operation/Safety Improvements 80 83 87 90 94 97 101 105 109 114 960
Annu,,1 Program Subtotals 328 860 894 930 %7 1,006 1,046 1,088 1,132 1,177 1,224 10,653
No. Project
1 (2)
2 (3)
3
¡
5
6
7
8
8A
9
10
11
12
13
14
15
16
17
ï8
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
16th Ave S - SR 1810 SR 99
SW3561h St - 21st Ave SW to 1st AveS
16th Ave SWat Adelaide Park
Dash Point Rd at 11th PI S & Sacajawea
Traffic Signal Coordination - S 320th St, SR 99
(4) S348thSt-I-5toSR99
(5) S 356thSt -isl AveS to SR 99
SW 336th St - 21st Ave SW to Hoyt Road
4th AveS -S 312thSt tog 316thSt
(6) 23rdAveS-S317thSttoS324thSt
Campus Dr SW - 7th Avenue SW to 34500 Blk
S 304th St - 28th Ave S to Military Rd
(7) S 312th St - SR 99 to 23rd Ave S '216
21st Ave SW/Dash Point Sidewlk - 356th 10 312th SI
S 288th SllMililary Rd Signal Upgrade
Mililary Rd at Star Lake Rd '
Dash Point Road - Spot Safety Improvements
S 336th St at SR 99
S317thSt - 23rd Ave S to 28th Ave S
S 312th St at 8th Ave S Signal
Isl Ave S. S 320th St to S 316th St
21st Ave SW/Dash Point Widening - 356Ih'lò'312th SI
CBD Ring Road Completion
S 340th SI al Hoyt Rd Signal
1st Ave S - S 348th St 10 S 356th SI
Isl Ave S - SW3561h SI to SW368th St
SW 320th SI at 47th Ave SW Signalization
S 324th SI- SR 99 to 17th AveS
Mililary Rd Widening - 1-5 (S) 10 1-5 (N)
S 3561h SI. SR 99 to SR 161
SW 368lh SI- 2nd Ave S to 61h Ave S
81h Ave SW - SW 316th to SW 3121h St
Dash Point Rd & Hoyt Road Si~nalization
S 304th Street - SR 99 to 28th Ave S
S336thSt - 20th Ave S to 1-5
206
479
82
170
228
404
322
1,228
100
1,542
1,215
1,227
3,320
2J8
45
1,3%
169
,789
ill
204
378
9,766
7,580
511
1,073
896
457
1,143
6,395
1,726
552
246
531
1,896
1,205
52,035
206
205
82
170
274
228
150 254
--šõ24i
186 1,042
15 85
150 153 1,239
217 997
156 1,071
692 2,362
238
50
45
162 1;234
169
947 3,842
43
274
44 161
74 304
2,581 7,185
326 4,753 2,500
95
m
779
68
416
š99
117
389
~42
1,196 5,199
517 1,208
82 470
246
99
ill
234
433
1,571
971
1,445 2,258 1,697 2,998 3,685 5,446 5,145 5,546 8,JO1 4,921 10,594
35 BP A Trail Phase 1 - City Center Segment
36 BP A Trail Phase II - City Center to Panlher Lake
37 BP A Trail Phase II - Panther Lake Segment
Non-Motorized Capital Improvements Subtotals
Total City Expenditure
358
358
734
636
734
358
636
636
734
1,982 3,476 3,325 4,564 4,652 6,452 6,192 6,634 9,433 6,098 11,818 62,689
37 (8) SR 1611SR 18 - SR 18 to S 360th St
38 1.5 Interchange Study al SR 161
39 Park & Ride Lot. 21st Ave SW & SW 3441h St
Canol.
Study
Bw SIte
Cone\.
Noles
(1) Study 10 detannlne Imptovemento needs to SR 509 end beat Iocetfon for new Inlarchenge wI1h ~5.
(2) $3,617 ptoject (olel. City $206. Other funding from KIng County, WSDOT end FAUS.
(3) $6.269 ptoject (olel. City $586. Other funding from KIng County end UATA.
(4) $1,770 ptoec\ tolel. City $404. Other funding from TIA, WSDOT end Metro.
(5) $4,198 ptOject tolel. City $312, KIng County $822, UATA$3.003.
(6) $1,490 ptOect toteJ. $120 funded by mitigation Ieea. $150wtll be expended on 1ha ptOect In 1992l88ultlng In a $30.000 nelexpendlture.
(7) $2.960 ptoject tolel. $216 ¡a funded by mitigation Ieee.
(8) Theae proocto which are fully funded by WSDOT are Iialed lor Infannatlon only.
-
. EXHIBIT".
.
I
TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
1993 - 2002
4!:;¡¡H¡¡~~~JES
COMPREHENSIVE TRANSPORTATION PLAN
DASH POINT ROAD STUDY - LAKOTA PLANT TO 1-5
mI¡¡¡m¡~M;~gQ~
RESURFACING PROGRAM AND EMERGENCIES
NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM
MINOR CAPITAL IMPROVEMENT PROJECTS
- WHEELCHAIR RAMPS. PEDESTRIAN IMPROVEMENTS
- SIDEWALK COMPLETION PROGRAM
- STREET '" SHOULDER PAVEMENT SAFETY PROGRAM
- TRAFFIC SIGNAL OPERATION/SAFETY IMPROVEMENTS
PJî1¡m¡Hæitœ,§~~~£~Q~
16TH AVB S - SR 18 TO SR 99
WIDEN STREET TO 5 LANES. SIDEWALKS, ILLUMINATION, SIGNAL MODIFICATION AT S 348TH STREET, NEW
SIGNAL AT SR 99
SW 356TH ST - 21ST AVB SW TO 1ST AVB S
WIDEN STREET TO 5 LANES, WITH PROVISIONS FOR BICYCLES, SIDEWALKS, ILLUMINATION, STREET TREES,
SIGNAL MODIFICATIONS AT 21ST AVENUESW AND 1ST AVENUES
16TH AVB SW AT ADELAIDB PARK
WIDEN TO FULL 36' WIDE STREET ADJACENT TO ADELAIDE PARK WITH SIDEWALK ON WEST SIDE
DASH POINT RDAT 11TH PLS & SACAJAWEA
INSTALL PEDESTRIAN AND VEHICLE ACTUATED TRAFFIC SIGNAL
TRAFFIC SIGNAL COORDINATION - S 320111 ST, SR 99
INSTALL CONTROLLERS AND INTERCONNECT EQUIPMENT TO COORDINATE TRAFFIC SIGNALS IN CITY CENTER
ON S 32OTH STREET FROM 1-5 TO 8TH AVENUE S, AND ON SR 99 FROM S 3O4TH STREET TO S 324TH STREET
S 348TH ST - SR 161 TO 1-5
REALIGN ROADWAY TO CORRECT LANE OFFSET AT SR 99, HOV LANE, SIDEWALKS, SIGNAL MODIFICATION,
ILLUMINATION, STREET TREES. PROPERTY ACQUISITION
S 356TH ST-1ST AVB S TO SR 99
WIDENTO 5 LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS, SIGNAL MODIFICATION. ILLUMINATION (KING
COUNTY ADMINISTERED)
SW 336TH ST - 21ST AVE SW TO HOYT ROAD
FROM 21ST AVENUE SW TO 26TH PLACE SW WIDEN TO 5 LANES, SIDEWALKS. SIGNAL MODIFICATION.
ILLUMINATION. PROPERTY ACQUISITION, FROM 26TH PLACE SW TO HOYT ROAD RESURFACE PAVEMENT AND
CHANNELIZE WITH A CENTER TWO- WAY LEfT TURN LANE.
8A
4TH AVE S - S 312TH ST TO S 316Tll ST
REALIGN ROADWAY TO ELIMINATE SIGHT DISTANCE PROBLEM DUE TO VERTICAL CURVE AND HALF STREET
TRANSITION,
23RDAVE S - S 317Tll ST TO S 324TH ST
WIDEN TO 5 LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS. SIGNAL MODIFICATION. ILLUMINATION,
STREET TREES, PROPERTY ACQUISITION
- 1 -
10
CAMPUS DR SW - 7TH AVE SW TO 34500 BLOCK
WIDEN TO 5 LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS, SIGNALIZE 6TH WAY SW INTERSEcrlON.
REALIGN POOL AND BALL FIELD DRIVEWAYS, STREET TREES, PROPERTY ACQUISITION
II
S 304m ST - 28TH AVE S TO MIUTARY RD
WIDEN TO 3 LANES WITH PROVISIONS FOR BICYCLES, IMPROVE SIGIIT DISTANCE. NB LEFT TURN POCKET ON
MILITARY RD, NB LEFT TURN ON 28TH AVE S. SIDEWALKS. ILLUMINATION. STREET TREES, PROPERTY
ACQUISITION
12
S 312TH ST - SR 99 TO 23RD AVE S
WIDEN TO 5 LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS, ILLUMINATION. SIGNAL MODIFICATION,
STREET TREES, PROPERTY ACQUISITION.
13
21ST A VE SWIDASH POINT SIDEWALK - 356m ST TO 312m ST
INSTALL SIDEWALKS WHERE NO SIDEWALKS EXIST
14
S 288m STIMIUTARY ROAD SIGNAL UPGRADE
MODIFY TRAFFIC SIGNAL DISPLAYS AND REPLACE SIGNAL CONTROLLER TO INCREASE CAPACITY
IS
MIUTARY RD AT STAR LAKE RD
CONSTRUCT NB LEFT TURN POCKET. WIDEN STAR LAKE RD APPROACH, ILLUMINATION
16
DASH POINT ROAD - SPOT SAFETY IMPROVEMENT
CONSTRUCT MINOR WIDENING FOR TURN POCKETS. CHANNELIZATION. ILLUMINATION AND SIGNING
IMPROVEMENTS AT VARJOUS SPOT LOCATIONS TO BE IDENTIFIED IN THE TRANSPORTATION ELEMENT OF THE
COMPREHENSIVE PLAN
17
S 336m ST A1 SR 99
WIDEN TO S LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS, SIGNAL MODIFICATION, ILLUMINATION,
STREET TREES, PROPERTY ACQUISITION
18
S317m ST-23RDAVE S TO 28TH AVE S
WIDEN '" REALIGN S 317rH AT BOTH INTERSEcrlONS TO PROVIDE LEFT TURN POCKETS
19
S 312m STO 8TH AVE S SIGNAL
SIGNALIZE INTERSEcrlON TO IMPROVE SOUTHBOUND TRAFFIC MOVEMENTS
20
1ST AVE S - S 320TH S1 TO S 316TH ST
WIDEN TO S LANES WITH PROVISIONS FOR BICYCLES. SIDEWALKS, DRAJNAGE. ILLUMINATION, PROPERTY
ACQUISITION
21ST A VE SWIDASH POINT WIDENING - 356TH ST TO 312m ST
WIDEN TO 5 LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS, DRAJNAGE, ILLUMINATION, PROPERTY
ACQUISITION
21
22
CBD RING ROAD COMPLETION
CONSTRUCT COMMERCIAL STREET LINKING 11TH AVENUE S TO 14TH AVENUE S WITH A CONNECTION TO SR
99 AT S 316TH STREET, SIDEWALKS. ILLUMINATION, STREET TREES. PROPERTY ACQUISITION
23
S 340m ST AT HOYT RD SIGNAL
INSTALL TRAFFIC SIGNAL, WIDEN INTERSECfION APPROACHES TO 3 LANES, ILLUMINATION, PROPERTY
ACQUISITION
24
1ST A VE S - S 348TH S1 TO S 356m S1
WIDEN TO S LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS. ILLUMINATION. STREET TREES, PROPERTY
ACQUISITION
2S
1ST AVES - SW 356TH S1 TO SW 368m S1
WIDEN TO 3 LANES WITH SIDEWALKS. ILLUMINATION
26
sw 320m STREET 0 47TH AVE SW SIGNAliZATION
INSTALL TRAFFIC SIGNAL. \\1DEN 471l1 AVE SW APPROACHES TO 3 LANES
- 2 -
27
S 324m ST- SR 99 TO 17TH AVE S
WIDEN TO 5 LANES WITH PROVISIONS FOR BICYCLES. SIDEWALKS, SIGNAL MODIFICATION. ll.LUMINATiON.
CHANNELIZE MALL INTERSECTION, PROPERTY ACQUlsmON
28
MIUTARY RD WIDENING - 1-5 (S) TO 1.5 (N)
WIDEN TO 5 LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS. SIGNALIZE 6TH WAY SW INTERSECTION,
REALIGN POOL AND BALL FIELD DRNEW A YS, STREET TREES. PROPERTY ACQUlSmON
29
S 356TH ST - SR 99 TO SR 161
NEW ALIGNMENT, 5 LANES WITH PROVISIONS FOR BICYCLES. SIDEWALKS. ll.LUMINATION. STREET TREES. BIKE
LANES, COORDINATE REGIONAL STORM DETENTION WITH THIS PROJECT, PROPERTY ACQUlSmON
30
SW 368m ST- 2ND AVE S TO 6TH AVE S
WIDEN TO FULL WIDTH STREET
31
8m AVE SW - sw 316m TO SW 312TH ST
WIDEN TO FULL WIDTH STREET
32
DASH POINT RD & HOYT RD SJGNALIZATION
INSTALL TRAFFIC SIGNAL WITH MINOR APPROACH WIDENING
33
S 304m - SR 99 TO 28TH AVE S
WIDEN TO 3 LANES WITH PROVISIONS FOR BICYCLES. SIDEWALKS, n.LUMINATION, STREET TREES, RE-GRADE
ROAD, ADDmONAL WIDENING AT SR 99, SIGNAL MODIFICATION, PROPERTY ACQUlSmON
34
S 336m ST- 20TH AVE S TO 1.5
WIDEN TO 5 LANES WITH PROVISIONS FOR BICYCLES, SIDEWALKS, n.LUMINATION, RE-GRADEROAD, PROPERTY
ACQUlSmON
";;Äi1!!t:.!1ii¡mgß#mHi1œ&i;!8fl~.Q~
35
SPA TRAIL PHASE 1 - CITY CENTER SEGMENT
36
SPA TRAIL PHASE II - CITY CENTER TO PANmER LAKE
37
BPA TRAIL PHASE II- PANTHER LAKE SEGMENT
!i.MmjjH~r;jt!p~
38
SR 161/SR 18-1-5 OVERCROSS1NG TO 1-5 INTERCHANGE
WIDEN SR 161 TO 5 LANES WITH PROVISIONS FOR BICYCLES, SIGNALIZESW 356TH INTERSECTION, SIDEWALKS,
BIKE LANES. n.LUMINATION. ADD LANES ON SR 161 AND ON SR IS AT INTERSECTION
39
1-5 INTERCHANGE STUDY AT SR 161
NORTH ORIENTED ON/OFF RAMPS, wn.L INVOLVE SR 18 INTERCHANGE, CONSIDER SB OFF RAMP TO SW 356TH
40
PARK & RIDE WT. 21ST AVE SW & SW 344m ST
WSDOT wn.L ACQUIRE SITE IN 1993. CONSTRUCTION DATE UNCERTAIN. NO FUNDING AT THIS TIME.
7/28/92
- 3 -